RFQ US CONGEN JHB PUMP CONTROLLER REPLACEMENT
State, Department of · STATE, DEPARTMENT OF
- Response deadline
- Jul 21, 2026, 8:00 PM EDT
- Posted
- Jun 21, 2026
- Solicitation
- 19SF5026Q0037
- Set-aside
- No Set aside used
- Place of performance
- JOHANNESBURG, ZAF
- Contracting office
- U.S. EMBASSY PRETORIA · WASHINGTON · DC
- Source
- SAM.gov · updated Jun 22, 2026
Description
A. The purpose of this firm fixed price purchase order is for a pump controller, or fuel oil control panel, replacement for the existing fuel systems in the NOB. These services shall result in all systems being serviced under this agreement being in good operational condition when activated. B. The contract will be for one-year period of performance to procure, ship, and execute the services outlined in the SOW and will be expected to commence no later than February 1, 2027.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Not enough similar awards to show a range yet
Fewer than five matching public awards are in our index for this lane — not enough to show a fair range.
We looked for: Same industry code (22112) · Same product/service code (5998) · Prime contracts (not umbrella IDVs)
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 9d18e1aa98314f7eb5f228065871de69.