VA Southern Oregon Rehabilitation Center and Clinics Phase I
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Oct 14, 2025, 6:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Oct 14, 2025, 6:00 PM EDT
- Posted
- Oct 1, 2025
- Solicitation
- W9127N25RA034
- Set-aside
- None listed
- PSC
- —
- Place of performance
- White City, OR, USA
- Contracting office
- W071 ENDIST PORTLAND · PORTLAND · OR
- Source
- SAM.gov · updated Jul 5, 2026
Description
*Draft Solicitation has been attached; due date extended to 14 Oct 2025.* Project Labor Agreements (PLA) Survey Follow-On Questions: This is a SPECIAL NOTICE for Market Research ONLY. NO AWARD will be made from this Sources Sought Notice. To better inform industry, a DRAFT Design-Build solicitation (phase 1) for the project will be uploaded 30 Sep 25. Requirements and scope included in the draft solicitation are subject to change. The Department of Veteran�s Affairs (VA) Office of Construction and Facilities Management team (DVA-CFM) Central Region and the Portland District (NWP) U.S. Army Corps of Engineers (USACE) team (i.e., the Government) are partnering to provide new buildings, life and health safety upgrades, and facilities improvements to the VA Southern Oregon Rehabilitation Center and Clinics (SORCC) in White City, Oregon. SORCC, located in Jackson County, north of Medford, Oregon, serves veterans living in southwestern Oregon. Current services offered at SORCC include primary care, radiology, social work, mental health, rehabilitation, pharmacy, and laboratory services, among others. As background, the current SORCC campus is located on the same grounds as the original U.S. Army Camp White Station Hospital. The original hospital was constructed in 1942 during World War II. The camp was deactivated in 1946, and the Camp White Station Hospital was transformed into the VA Domiciliary in 1949. Many of the current buildings utilized in the campus were constructed during the Camp White era. As such, they are generally two (2) stories, long and linear in shape, and of hollow-clay tile wall construction with brick veneer exterior. SORCC PLA Survey September 2025: As the Portland District finalizes its project scope for the subject requirement, it is also revalidating its project cost estimate to ensure funding is available for the anticipated contract value, including costs associated with the project but that aren't direct construction costs. One of these costs relates to the potential inclusion of a requirement for a project labor agreement. As there is little to no information available regarding the costs associated with a PLA requirement on a USACE managed, Department of Veterans Affairs medical facility construction project, additional market research is being conducted. If you are interested in proposing on the subject project, please complete the survey below. If you answer �No� to any question, skip the remaining questions and submit the survey response with the remaining questions blank. Do you have experience executing Design-Build construction contracts greater than $100M as a prime contractor? The project solicitation is expected to include a Construction Cost Limitation of $250M. Based on the draft scope information provided would you anticipate submitting a proposal on this project if PLAs are not required? (i.e. would you expect a proposal under $250M for this project to be feasible?) The project solicitation is expected to include a Construction Cost Limitation of $250M. Based on the draft scope information provided, and your understanding of cost risks associated with a PLA on a firm-fixed-price contract, would you anticipate submitting a proposal on this project if PLAs are required? (i.e. would you expect a proposal under $250M for this project, that includes a requirement for a PLA, to be feasible?) In what ways might, if any, a requirement for a PLA increase a proposal price on a project of this type in the project�s region? If so, how much of an increase to your proposal price do you anticipate in terms of percentage? Are there ways the Portland District could reduce price risk while including a requirement for a PLA that would lower the percentage increase? Explain in detail. Identify any additional information you believe should be considered on the use or non-use of a PLA on the referenced project.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$465,946
Middle of the pack for similar past awards
Most similar awards fall between $98,040 and $2.23M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1BL HARBERT INTERNATIONAL LLC25 awards$5.86B
- 2CADDELL CONSTRUCTION CO. (DE), LLC13 awards$4.45B
- 3BCCG A JOINT VENTURE8 awards$3.41B
- 4BRASFIELD & GORRIE LLC11 awards$1.87B
- 5WHITING-TURNER CONTRACTING COMPANY, THE32 awards$1.72B
- 6HENSEL PHELPS CONSTRUCTION CO6 awards$1.39B
- 7FISHER SAND & GRAVEL CO4 awards$1.31B
- 8CLARK CONSTRUCTION GROUP LLC3 awards$1.05B
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 9e36fb881bfd470ea92363b0305e6c6b.