Operation & Maintenance of the South Bay Wastewater Treatment Plant
International Boundary and Water Commission: US-mexico · INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
This notice is not accepting responses.
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Not listed
- Posted
- Apr 2, 2026
- Solicitation
- 191CWC26C0043
- Set-aside
- No Set aside used
- Place of performance
- San Diego, CA, USA
- Contracting office
- INTERNAT. BOUNDARY AND WATER COMM. · El Paso · TX
- Source
- SAM.gov · updated Jul 5, 2026
Description
(Fixed?Price, Not Competitively Awarded, Includes Transition Options) This contract action was not awarded competitively, but it is a fixed?price contract. In accordance with FAR 6.302?1, Only One Responsible Source, the U.S. Section of the International Boundary and Water Commission (USIBWC) determined in a formal Determination & Findings that only the incumbent, Veolia Water North America � West, LLC, could provide uninterrupted Operations & Maintenance (O&M) services at the South Bay International Wastewater Treatment Plant (SBIWTP) during the required acquisition corrective?action period. The plant is a 24/7 critical?infrastructure facility where any operational lapse would result in immediate environmental, public?health, regulatory, and treaty?compliance impacts. The prior competitive solicitation (No. 191BWC26R0001) was canceled due to material deficiencies in the PWS, ambiguous requirements, and a significant undisclosed organizational conflict of interest (OCI), requiring a full re?solicitation under a defensible competitive process. The Government requires the full contract period to properly complete the next competitive procurement to be awarded upon the conclusion of this action. The period of performance for this sole?source contract is April 1, 2026 through March 31, 2027, with an additional two?month option period (April 1, 2027 through May 31, 2027) to support transition to a newly?awarded competitive successor contract if required. These transition CLINs ensure continuity of operations and prevent degradation of mission?essential wastewater treatment services during contractor turnover. This limited?duration, sole?source, fixed?price bridge action is required solely to maintain uninterrupted operations while the Government prepares, competes, and awards the upcoming full and open long?term O&M contract.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$65,148
Middle of the pack for similar past awards
Most similar awards fall between $24,990 and $262,695
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1VEOLIA WATER WEST OPERATING SERVICES INC3 awards$95.08M
- 2SUNSTATE ENVIRONMENTAL SERVICES INC1 award$17.52M
- 3SOUTH GRANVILLE WATER & SEWER AUTH2 awards$9.17M
- 4BAIRCO CONSTRUCTION INC1 award$7.74M
- 5CITY OF HOPEWELL HRWTF3 awards$4.59M
- 6OPTIMUM ENVIRONMENTAL CORPORATION3 awards$4.15M
- 7VILLAGE OF SARANAC LAKE3 awards$3.11M
- 8GREGG TOWNSHIP MUNICIPAL AUTHORITY2 awards$2.11M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 9f7ad12281f64837a6147b34ac9f2811.