ClosedSolicitation
Dept of Defense contract category

FY26 Willapa Bay Maintenance Dredging

Dept of Defense · DEPT OF THE ARMY

This notice is not accepting responses (deadline was Dec 16, 2025, 7:00 PM EST).

Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.

Response deadline
Dec 16, 2025, 7:00 PM EST
Posted
Nov 16, 2025
Solicitation
W912DW26BA001
Set-aside
None listed
Place of performance
Contracting office
W071 ENDIST SEATTLE · SEATTLE · WA
Source
SAM.gov · updated May 9, 2026

Description

Willapa Harbor Maintenance Dredging project in Willapa Harbor, Washington.USACE, Seattle District has been tasked to solicit for and award a construction contract to maintenance dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths. Up to 180,000 CY is expected to be dredged across the three features via mechanical clamshell dredging. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft (Tokeland), MLLW, +2 ft overdepth at each location. In addition, dredging approximately 10,000 CY to a minimum depth of -9 ft MLLW (+1 ft overdepth) may be required in the Bay Center/Palix River Access Lane to ensure sufficient water depths for the dredge, scow, and tugboats to transit between Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom dump scow at the Cape Shoalwater open-water dispersive disposal site or the South Channel open-water dispersive disposal site. Work is anticipated to begin in summer 2026. The work window varies by project features. For any given calendar year, the in-water work windows are as follows:? Bay Center/Palix River: 16 Jul through 30 Sep? Nahcotta: 16 Jul through 01 Feb? Tokeland: 16 Jul through 15 FebWillapa Bay presents significant navigational hazards due to its exposed Pacific Ocean entrance, unmaintained channels, shifting shoals, and unpredictable weather. This performance window includes the worst season for storm and marine conditions. The U.S. Coast Guard has removed aids-to-navigation at Willapa Bar because of unreliable conditions, and their Waterways Analysis notes over 50 unreported groundings annually. These hazards present serious safety concerns for contractors and local users, complicating mobilization and dredging operations throughout the project area.In accordance with Federal Acquisition Regulation (FAR) Part 36 , the estimated construction price range for this project is: Between $5,000,000 and $10,000,000. Estimated duration of the dredging activities is 3-7 months. PLEASE SEE THE ATTACHED SOLICITATION, SPECIFICATIONS AND DRAWINGS FOR INSTRUCTIONS ON SUBMITTING A BID IN RESPONSE TO THE SOLICITATION.

What similar awards have paid

Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.

Typical award size

$1.83M

Middle of the pack for similar past awards

Most similar awards fall between $317,400 and $6.69M

Lower end$317,400Typical$1.83MHigher end$6.69M
Based on 417 similar awardsSame industry code (237990)Prime contracts (not umbrella IDVs)

Who has won work like this

Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.

Recent examples

A few of the newest similar awards in our index.

Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.

Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID a4b50026f03046bd9652f3f157fdd55c.

Similar open government contracts

More in 237990 →
Federal vendorsMore from Dept of DefenseNAICS 237990PSC Y1KF