Payette NF Disaster Relief Fence Reconstruction
Agriculture, Department of · FOREST SERVICE
This notice is not accepting responses (deadline was Mar 4, 2026, 3:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Mar 4, 2026, 3:00 PM EST
- Posted
- Feb 5, 2026
- Solicitation
- 1240LT26Q0018
- Set-aside
- Total Small Business
- Place of performance
- ID, USA
- Contracting office
- PAYETTE NATIONAL FOREST · MCCALL · ID
- Source
- SAM.gov · updated Jul 5, 2026
Description
The 2024 Lava Fire on the Boise National Forest destroyed several range fence improvements that are vital to managing livestock on the Payette C&H allotment as well as preventing unauthorized or excess livestock use from the neighboring Payette National Forest and Ola C C&H allotment. In total, approximately 59,183 feet, or 11.2 miles, of fence needs to be reconstructed/replaced. This is in accordance with analysis completed in the 2025 Lava Post Fire EA. The project is split between three prior existing fences that were destroyed by wild?re, the Mill Creek Summit Boundary Fence (23,545�), the Thirdfork Boundary Fence (17,181�), and the Payette � Ola C Boundary Fence (18,457�). All fences incorporate existing cattle guards which remain in place and do not require additional work aside from connecting the fence. This project is for the reconstruction/replacement of the fences including materials provided by the contractor. All fences will be of the same construction, following the speci?cations below. Work is to be conducted in remote sections of National Forest Land on the Boise National Forest and will have limited road access or equipment staging areas. Soil type and depth to rock will vary across the project area. All work and disturbance is to be con?ned within a 20-foot buffer,10 feet on either side of the designated fence path. Clearing the buffer area of minor obstructions, such as downed trees or branches, is allowable. No live trees should be cut. Minor deviation from the designated fence path is allowed where necessary to avoid timber, rock out crops, or other larger obstructions. Access and use of small equipment, i.e. skid steers, ATVs, UTV, etc. is authorized within the buffer area where practical. Total avoidance of threatened or endangered vegetation species, including White Bark Pine, Pinus albicaulis, is required. At no point should fences be secured to trees in any fashion. If at any point cultural/heritage resources are discovered, all work shall cease until forest heritage staff can be consulted.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$59,220
Middle of the pack for similar past awards
Most similar awards fall between $19,025 and $184,172
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1DOLIVEIRA SYSTEMS LLC1 award$2.49M
- 2ACCESS COMMUNICATIONS GROUP, LLC2 awards$1.98M
- 3VETERANS CONSTRUCTION AND DESIGN INC.1 award$696,151
- 4VISIONARY CONSTRUCTION INC1 award$680,905
- 5TEPA EC, LLC1 award$533,000
- 6TRAFFIC SAFETY SERVICE LLC1 award$353,188
- 7POWER CONSTRUCTORS LLC1 award$252,902
- 8KFOWLER CONSTRUCTION LLC1 award$234,983
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.