USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Dept of Defense · DEPT OF THE NAVY
This notice is not accepting responses (deadline was Jun 30, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jun 30, 2026, 8:00 PM EDT
- Posted
- Jun 23, 2026
- Solicitation
- N5523626R0009
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- SOUTHWEST REGIONAL MAINT CENTER · SAN DIEGO · CA
- Source
- SAM.gov · updated Jun 25, 2026
Description
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$61,636
Middle of the pack for similar past awards
Most similar awards fall between $24,334 and $161,709
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1FAIRBANKS MORSE, LLC9 awards$13.51M
- 2CUMMINS INC.14 awards$6.53M
- 3RRDS INC2 awards$5.94M
- 4PACIFIC POWER GROUP, LLC47 awards$4.17M
- 5THE W.W. WILLIAMS COMPANY, LLC4 awards$2.91M
- 6JOHNSON & TOWERS LLC5 awards$2.25M
- 7CUMMINS INC.1 award$468,106
- 8GUARDIAN SYSTEMS LLC6 awards$360,939
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID af40bb13112c48dba1cfe7658c48d04e.