FMS Japan Repair, COMPUTER, FLIGHT CON, NIIN 015486318, QTY 1
Dept of Defense · DEPT OF THE NAVY
This notice is not accepting responses (deadline was Mar 11, 2026, 4:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Mar 11, 2026, 4:00 PM EDT
- Posted
- Feb 11, 2026
- Solicitation
- N00383-26-Q-A064
- Set-aside
- No Set aside used
- Place of performance
- Endicott, NY, USA
- Contracting office
- NAVSUP WEAPON SYSTEMS SUPPORT · PHILADELPHIA · PA
- Source
- SAM.gov · updated Jul 5, 2026
Description
This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor�s facility as reflected in the Action Date entry in the commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$70,211
Middle of the pack for similar past awards
Most similar awards fall between $18,661 and $462,018
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1INTEGRATED COAST GUARD SYSTEMS LLC59 awards$1.70B
- 2RAYTHEON COMPANY1 award$1.22B
- 3L3HARRIS TECHNOLOGIES, INC.1 award$814.44M
- 4RAYTHEON COMPANY6 awards$594.49M
- 5NORTHROP GRUMMAN SYSTEMS CORPORATION1 award$583.02M
- 6BAE SYSTEMS SPACE & MISSION SYSTEMS INC.2 awards$489.22M
- 7ANALOGIC CORP7 awards$247.86M
- 8SMITHS DETECTION INC.11 awards$162.79M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID b1973020cb874a0a9764102f6ca6ea80.