ClosedPresolicitation
Energy, Department of contract category

Building 1916-T2 Stormwater Drainage Repair and Parking Lot Asphalt Re-sealing Project

Energy, Department of · ENERGY, DEPARTMENT OF

This notice is not accepting responses (deadline was Oct 31, 2025, 12:00 PM EDT).

Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.

Response deadline
Oct 31, 2025, 12:00 PM EDT
Posted
Oct 24, 2025
Solicitation
D9HFSCYSX833
NAICS
Place of performance
Oak Ridge, TN, USA
Contracting office
SC OAK RIDGE OFFICE · OAK RIDGE · TN
Source
SAM.gov · updated Jul 5, 2026

Description

The Department of Energy (DOE) is issuing a Request for Information (RFI) only and will not accept any proposals at this time. If the vendors wish to do so, they may submit a capabilities statement along with the RFI. This RFI is for the services to restore and enhance the functionality, safety, and appearance of the asphalt parking areas and address stormwater drainage issues at Building 1916-T2, located at 230 Warehouse Road, Oak Ridge, Tennessee 37830. The overall goal for this project is to achieve a restored and re-sealed asphalt parking lot with clearly marked parking spaces, functional stormwater drainage, and specific structural repairs, all executed in accordance with prevailing industry standards, applicable codes, and DOE requirements. The main reqirements for this project are listed below: Item 1: Achieve Durable Asphalt Surface Restoration. Performance Standard: The contractor shall thoroughly prepare all asphalt surfaces, remove vegetation, seal cracks, patch areas as specified, and apply two layers of asphalt sealer to all designated areas, including the asphalt ramp, to create a durable, sealed surface. Item 2: Implement Clear and Compliant Parking Lot Markings. Performance Standard: The contractor shall re-stripe all parking spaces in white, no-parking hatched areas in yellow, paint handicap symbols, and add "COMPACT" lettering as indicated on the provided drawings. Item 3: Ensure Effective Stormwater Drainage Functionality. Performance Standard: The contractor shall remove concrete for new concrete placement and compact gravel/broken pavement as necessary to restore and enhance stormwater drainage along the Warehouse Road side of Building 1916-T2. Item 4: Complete Specific Structural and Accessory Repairs. Performance Standard: The contractor shall replace the damaged awning column at Bay 3's handicap ramp and install three parking bumper wheel stops at the indicated spaces near Bay 3's handicap ramp.

What similar awards have paid

Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.

Typical award size

$87,500

Middle of the pack for similar past awards

Most similar awards fall between $34,999 and $641,586

Lower end$34,999Typical$87,500Higher end$641,586
Based on 57 similar awardsSame product/service code (Z2LZ)Prime contracts (not umbrella IDVs)

Who has won work like this

Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.

Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.

Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID c283768b779041078630e117a68d13e6.

Similar open government contracts

Browse all →
Federal vendorsMore from Energy, Department ofPSC Z2LZTennessee contractsTotal Small Business