Lexington Harbor Breakwater Repair
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Feb 23, 2026, 7:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Feb 23, 2026, 7:00 PM EST
- Posted
- Jan 22, 2026
- Solicitation
- W911XK26BA006
- Set-aside
- Total Small Business
- Place of performance
- —
- Contracting office
- W072 ENDIST DETROIT · DETROIT · MI
- Source
- SAM.gov · updated May 9, 2026
Description
Lexington Harbor Breakwater Repair. This project includes breakwater repair operations at Lexington Harbor. The north breakwater is a permeable rubble mound structure and allows sand shoaling within the harbor. Voids in the north breakwater are exacerbating sediment infiltration within the harbor. A walkway is present atop the north breakwater. The walkway is approximately 5 feet wide and generally in good condition. The north breakwater voids are partially sand filled. The sand fill depth varies; however, sand generally extends to the existing water elevation. The project objective is to alter the existing permeable rubble mound breakwater structure to an impermeable structure. The proposed scope of work includes constructing a grout curtain wall within the structure. The proposed grout curtain wall is chemical grout and a cementitious grout material. The chemical grout material is proposed within the sand filled breakwater structure. The cementitious grout material is proposed above the sand filled area. The intent of the grout curtain wall is to prevent sand from infiltrating through the breakwater structure. The existing Portland cement concrete walkway is reconstructed upon completion of grouting operations. As previously stated, the project includes breakwater repair by constructing a grout curtain wall and Portland cement concrete walkway reconstruction. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$3.65M
Middle of the pack for similar past awards
Most similar awards fall between $605,348 and $15.68M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1TECH2 SOLUTIONS11 awards$180.54M
- 2APOGEE GROUP, LLC7 awards$170.82M
- 3GARCO CONSTRUCTION, INC.2 awards$143.39M
- 4MGC SERVICES A JOINT VENTURE LLC1 award$49.89M
- 5COASTAL CONSTRUCTION GROUP, LLC1 award$43.49M
- 6VETERAN DESIGN & CONSTRUCTION INC1 award$35.03M
- 7ODIN ENVIRONMENTAL SOLUTIONS, LLC1 award$34.80M
- 8ADVANCED AMERICAN CONSTRUCTION, INC.1 award$29.43M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID cdd5c1934e9345c08a5b2294189490c1.