MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Dec 19, 2025, 2:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Dec 19, 2025, 2:00 PM EST
- Posted
- Nov 20, 2025
- Solicitation
- W9127N26BA004
- Set-aside
- No Set aside used
- Place of performance
- Toutle, WA, USA
- Contracting office
- W071 ENDIST PORTLAND · PORTLAND · OR
- Source
- SAM.gov · updated Jul 5, 2026
Description
***19-NOV-25*** Having difficulty uploading the plans/drawings, they will be posted as soon as I am able. SYNOPSIS The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the Mt. St. Helens Sediment Retention Structure Crest Raise on the North Fork Toutle River in Cowlitz County, Washington. The proposed project will be a competitive, firm-fixed price (FFP) contract. Description of Requirement: The U.S. Army Corps of Engineers, Portland District, has a requirement to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package. Purpose: The project purpose is to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package. The work will be located at the Sediment Retention Structure on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$231,133
Middle of the pack for similar past awards
Most similar awards fall between $73,523 and $3.92M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1INTERSTATE ROCK PRODUCTS, INC.1 award$21.94M
- 2C & C CONTRACTORS LLC1 award$8.06M
- 3BCSS, LLC1 award$7.65M
- 4WONDRA CONSTRUCTION INC1 award$6.43M
- 5G.M. HILL ENGINEERING, INC.1 award$5.74M
- 6REHBEIN ENTERPRISES INC1 award$5.21M
- 7FEDVET CONSTRUCTION1 award$4.80M
- 8NORTH WIND GENERAL CONTRACTORS LLC2 awards$4.73M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID cea84a746a574bde8beaa191fce92151.