USCGC Gasconade SSDG Control Panel replacement
Homeland Security, Department of · US COAST GUARD
This notice is not accepting responses (deadline was Jan 6, 2026, 11:00 AM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jan 6, 2026, 11:00 AM EST
- Posted
- Dec 23, 2025
- Solicitation
- 70Z08526Q0002157
- Set-aside
- Total Small Business
- Place of performance
- Saint Louis, MO, USA
- Contracting office
- SFLC PROCUREMENT BRANCH 2(00085) · ALAMEDA · CA
- Source
- SAM.gov · updated Jul 5, 2026
Description
Statement of Work (SOW) Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG�s aboard CGC GASCONADE Background The purpose of this project is to replace both existing controllers on the cutters SSDG�s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment. Contractor Furnished Equipment Qty 2 � CAT Kit ELEK GP � 10R-6991 3. Scope of Work The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks: Removal of Old Controller: Safely disconnect and remove the existing controllers from the equipment. Ensure no damage is caused to surrounding components during removal. Installation of New Controller: Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications. Verify that all connections are secure and properly aligned. Calibration of Controller: Calibrate the newly installed controllers per the manufacturer's instructions. Ensure the controllers are functioning optimally and meets operational requirements. 4. Deliverables The contractor shall provide the following: Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers. Documentation of calibration settings and procedures performed. A brief report confirming the successful completion of the work and equipment functionality. 5. Period of Performance The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager. 6. Location of Work The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118 7. Contractor Responsibilities The contractor shall: Comply with all safety regulations and standards during the execution of work. Provide qualified personnel to perform the tasks outlined in this SOW. Ensure all tools and equipment used are in good working condition. 8. Government Furnished Equipment (GFE) None 9. Acceptance Criteria The work will be considered complete when: The old controllers have been removed without damage to the equipment. The new controllers have been installed and calibrated per the manufacturer's instructions. The equipment is fully operational and meets performance standards. 10. Points of Contact Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$20,007
Middle of the pack for similar past awards
Most similar awards fall between $10,499 and $51,844
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1GLOBAL MARITEK SYSTEMS INC2 awards$171.65M
- 2BOLLINGER MISSISSIPPI REPAIR, LLC1 award$70.42M
- 3PACIFIC SHIPYARDS INTERNATIONAL, LLC1 award$18.52M
- 4BAY SHIP & YACHT CO5 awards$9.12M
- 5BAYONNE DRYDOCK & REPAIR CORP.3 awards$3.70M
- 6SUNY MARITIME COLLEGE1 award$1.25M
- 7BLUEPOINT ENGINEERING LLC8 awards$1.01M
- 8SUNSTONE TECHNICAL SOLUTIONS, LLC13 awards$965,832
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID d108f1bfd85e4538991fa9ae9204626e.