Wilson Hall Facade Repairs and Restoration
Energy, Department of · ENERGY, DEPARTMENT OF
This notice is not accepting responses (deadline was Feb 17, 2026, 5:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Feb 17, 2026, 5:00 PM EST
- Posted
- Jan 15, 2026
- Solicitation
- 370886-CD
- Set-aside
- No Set aside used
- Place of performance
- Batavia, IL, USA
- Contracting office
- FERMILAB - DOE CONTRACTOR · Batavia · IL
- Source
- SAM.gov · updated Jul 5, 2026
Description
The Subcontractor shall perform all work as described in the Statement of Work for the Wilson Hall Facade Repairs and Restoration included as Exhibit A and the Wilson Hall Facade Repairs and Restoration Drawing Set included as Exhibit B. All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein. The requirements for repair and restoration of the Wilson Hall facade are segregated into three phases: Phase 1 includes restoration and repair of the East Elevation of Wilson Hall, Phase 2 includes restoration and repair of the North and South Elevations of Wilson Hall, and Phase 3 includes restoration and repair of the West Elevation of Wilson Hall. FFDG expects to award a contract that includes completion of Phase 1 in 2026. Phases 2 & 3 will be identified as unilateral options. Those options may be exercised at FFDG�s discretion in 2027, 2028, 2029 and/or 2030 based on FFDG�s determination of need and the availability of funding. It is FFDG�s expectation that each phase will be completed within 180 calendar days after issuance of a Notice to Proceed (NTP). A separate NTP will be issued for each phase.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$64,338
Middle of the pack for similar past awards
Most similar awards fall between $24,434 and $259,626
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1PATTERSON STEVENS INC2 awards$6.43M
- 2FEDERAL CONSTRUCTORS, INC.1 award$2.23M
- 3VETERANS CONSTRUCTION LLC1 award$2.05M
- 4SMR CONSTRUCTION INC.1 award$1.96M
- 5LESKCA INCORPORATED2 awards$1.73M
- 6LANDER GROUP LLC2 awards$833,264
- 7J. BRENNON CONSTRUCTION, INC.1 award$831,588
- 8WORRELL CONTRACTING CO INC1 award$819,670
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID d3763eead57c4ea09a633b0c7e427473.