Davidson River Campground Brevard Sewer Project
Agriculture, Department of · FOREST SERVICE
This notice is not accepting responses (deadline was Mar 2, 2026, 5:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Mar 2, 2026, 5:00 PM EST
- Posted
- Jan 22, 2026
- Solicitation
- 12445226Q0005
- Set-aside
- Total Small Business
- Place of performance
- Pisgah Forest, NC, USA
- Contracting office
- USDA-FS, CSA EAST 12 · Atlanta · GA
- Source
- SAM.gov · updated Jul 5, 2026
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0005 is issued as a Request for Quotation (RFQ) to replace the existing Schenck Job Corps pump station and existing force main to connect The Davidson River Campground and Pisgah Ranger District facilities north of US 276 to the City of Brevard Wastewater Collection System. Performance & Payment Bonds (FAR 52.228-15) s: Both required 100% of original contract award price. Due 5 days after an award. Irrevocable letter or credit or Payment Bond form SF-25A & Performance Bond Form SF-25 are allowed per FAR 52.228-13. Disclosure of the Magnitude of Construction Projects: The Magnitude of this project is between $1,000,000 and $5,000,000. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 237110. The small business size standard is $45 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. See �Attachment 1 - Solicitation Terms and Conditions- Davidson River Campground Brevard Sewer Project� for applicable clauses, instructions, and evaluation criteria. Statement of Requirement This project will replace the existing Schenck Job Corps pump station and existing force main to connect The Davidson River Campground and Pisgah Ranger District facilities north of US 276 to the City of Brevard Wastewater Collection System. This infrastructure is failing and incurring significant sewer surcharges to the Forest Service as well as contributing to Sanitary Sewer Overflows. Further details are located in the following attachments: Attachment 2- 2025 DRCG Brevard Sewer Tech Specs Attachment 3- Supp Spec Station 01400 Measurement & Payment Attachment 4- 2025 DRCG Brevard Sewer_FinalPlans Signed Reduced Size.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$10,565
Middle of the pack for similar past awards
Most similar awards fall between $8,950 and $20,743
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1PCL CONSTRUCTION INC1 award$60.05M
- 2BOYER COMMERCIAL CONSTRUCTION INC1 award$11.74M
- 3BAIRCO CONSTRUCTION INC1 award$9.89M
- 4RENOVA ENVIRONMENTAL COMPANY1 award$9.33M
- 5EPIK-AQUASHINE JV LLC4 awards$5.09M
- 6GREEN TECH-ACCU JV LLC3 awards$3.46M
- 7MIG GOV, LLC1 award$2.64M
- 8FLUID SOLUTIONS LLC3 awards$2.22M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID d3a987de399d4d7a9eb51d7330c79504.