Tinker AFB MAC BOA - WWYK190048 - Repair Restrooms and Janitors Closet, B1055
Dept of Defense · DEPT OF THE AIR FORCE
This notice is not accepting responses (deadline was Jan 6, 2026, 2:30 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jan 6, 2026, 2:30 PM EST
- Posted
- Jan 22, 2026
- Solicitation
- FA813726R0006
- Set-aside
- None listed
- Place of performance
- Tinker AFB, OK, USA
- Contracting office
- FA8137 AFSC PZIOC · TINKER AFB · OK
- Source
- SAM.gov · updated Jul 5, 2026
Description
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 02 - 21 JANUARY 2025 1) Official Solicitation has been posted, labeled: Solicitation - FA813725R0007 2) RFI's and their responses have been posted in the attached document labeled: 01a Answered 01142026 - COR Signed 3) Proposal Response Date: 23 February 2026 4) Please send proposals to the email of SSgt Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 01 - December 17, 2025 1) Site Visit was held and concluded on December 17, 2025 2) Requests for Information (RFIs) are due **Tuesday, January 6, 2026 @ 1300 (1:30pm)** 3) Please send RFIs to the email of SrA Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Project Solicitation Number: FA813725R0006 Project Title: WWYK190048 - Repair Restrooms and Janitors Closet, B1055 Renovation of the Men's and Women's Restrooms, Janitor's Closet and surrounding areas. The work to be performed under the terms of this contract consist of furnishing all plant, labor, tools, transportation, travel, equipment, materials (Except Government - furnished materials) and any other incidentals necessary for the replacement of restrooms' underground utilities, wall layout, fixtures, and room finishes. Project specific documents are attached to this posting. If you experience any difficulty at receiving or accessing the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission sent to your email. In the email, please provide email addresses for Prime Contractors points of contact ONLY, to have a DoD Safe link sent to. Do not include any sub-contractor email addresses. Currently, the Solicitation - Request for Proposal (RFP) is in the draft stage and will be posted once available. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Wednesday, 17 December, 2025 at 0900 (9:00 am) You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SrA Isaac Demmers at "isaac.demmers@us.af.mil". THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$278,966
Middle of the pack for similar past awards
Most similar awards fall between $67,688 and $890,560
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1J. E. DUNN CONSTRUCTION COMPANY1 award$74.81M
- 2THE BEDWELL COMPANY1 award$31.95M
- 3VOLMAR CONSTRUCTION INC1 award$30.98M
- 4HAMMER LGC INC7 awards$21.09M
- 5DUBOIS CONSTRUCTION, INC.1 award$13.45M
- 6AHTNA DESIGN-BUILD INC1 award$12.62M
- 7STRUCTURAL ENGINEERING GROUP INC1 award$11.63M
- 8SAW CONTRACTING, INC.3 awards$11.10M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID d7d60be66e7748089d5d3b4ea33b0c10.