ClosedPresolicitation
Dept of Defense contract category

Building Automation

Dept of Defense · DEPT OF THE AIR FORCE

This notice is not accepting responses (deadline was Apr 14, 2026, 10:30 AM EDT).

Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.

Response deadline
Apr 14, 2026, 10:30 AM EDT
Posted
Mar 30, 2026
Solicitation
F3N0425344A001
Set-aside
No Set aside used
Place of performance
Kaiserslautern, DE-RP, DEU
Contracting office
FA5613 700 CONS PK · APO · AE
Source
SAM.gov · updated Jul 5, 2026

Description

1.1 DESCRIPTION OF INCIDENTAL SERVICES. The contractor shall provide a complete building automation system (BAS) including BACnet/IP based controllers, electric cabinets, sensors and acutuators for the HVAC systems of the buildings. All work shall conform to standard commercial practices, in accordance with (IAW) the technical regulations for workplaces, and electrical TUV/VDE requirements. This shall include testing and balancing of all controllers and the new application. In phase 1 an existing building will be renewed, and new HVAC systems and the BAS will be installed. In phase 2 a new building will be built and connected to the existing building. The contractor shall be responsible for: 1.1.1 Delivery of field devices Sensors and actuators for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room 1.1.2 Delivery of electric cabinet including building automation system for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.3 Delivery of Software program specially designed for the building automation system for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.4 Commissioning and as built documentation for the building automation system for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.5 Delivery of field devices Sensors and actuators for phase 2 - heating circuit vehicle bay - Utilities room phase 2 1.1.6 Delivery of electric cabinet including building automation system for phase 2 - heating circuit vehicle bay - Utilities room phase 2 - Connection to ventilation system vehicle bay - Connection to the control system of the doors - various fault messages 1.1.7 Delivery of Software program specially designed for the building automation system for phase 2 - heating circuit vehicle bay - Utilities room phase 2 - Connection to ventilation system vehicle bay - Connection to the control system of the doors - various fault messages 1.1.8 Commissioning and as built documentation for the building automation system for phase 2 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.9 BACnet/IP data points to be named IAW ASHRAE 135, VDI 3814-1, and Ramstein Points Naming Convention 1.1.10 Prior to final Government acceptance, all as-built documents, warranty documentation, EDE Files shall be handed over as hard copies and/or secure electronic transfer (DOD SAFE). 1.2 ADDITIONAL TECHNICAL DESCRIPTION 1.2.2 All controllers to be BACnet/IP based, IAW ASHRAE 135 � 2020 and BTL certified. 1.2.3 Setpoints, trending, and alarms are to be determined by the Government. 1.2.4 To maintain system standardization and utilize available resources, all KMC buildings are to be uniformly equipped with BTL-certified building automation systems, preferably of the brand Kieback & Peter DDC4000, alternatively Siemens PXC4...PXC7. Only building automation systems from these two manufacturers, including all associated components, are permitted for use. 1.2.5 The contractor shall include project commissioning and submit a commissioning final report. Critical aspect of the project include ensuring that systems and components are designed, installed, tested, operated, and maintained according to the operational requirements. � Quality assurance � Cost-effectiveness � Improved efficiency � Enhaced safety � Compliance with regulations FAR 52.225-5, Trade Agreements�One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.�

What similar awards have paid

Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.

Typical award size

$117,090

Middle of the pack for similar past awards

Most similar awards fall between $28,272 and $355,437

Lower end$28,272Typical$117,090Higher end$355,437
Based on 500+ similar awardsSame product/service code (N059)Prime contracts (not umbrella IDVs)

Who has won work like this

Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.

Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.

Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID d8917f1d5e5e4d9db89c1ceba43f4cb7.

Similar open government contracts

More in 2382 →
Federal vendorsMore from Dept of DefenseNAICS 2382PSC N059