N045--Loch Raven VAMC Bldg. 6 Boiler Replacement REQUEST FOR QUOTE
Veterans Affairs, Department of · VETERANS AFFAIRS, DEPARTMENT OF
This notice is not accepting responses (deadline was Dec 3, 2025, 11:00 AM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Dec 3, 2025, 11:00 AM EST
- Posted
- Nov 14, 2025
- Solicitation
- 36C24526Q0118
- Set-aside
- Total Small Business
- Place of performance
- Baltimore, MD, USA
- Contracting office
- 245-NETWORK CONTRACT OFFICE 5 (36C245) · LINTHICUM · MD
- Source
- SAM.gov · updated Jul 5, 2026
Description
Page 1 of 1 SCOPE OF WORK LR Bldg 6 Boiler Replacement Project: 512-25-052 GENERAL SCOPE OF WORK: The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation. Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH). Provide disposal receipts to VA. Provide and install CSD-1 compliant Boiler sized to match existing boiler. Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed. Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$38,350
Middle of the pack for similar past awards
Most similar awards fall between $20,950 and $285,839
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1TJ&B AIR CONDITIONING AND ELECTRIC, LLC3 awards$10.83M
- 2T.C.I. CONSTRUCTION & MANAGEMENT CO., INC.1 award$7.89M
- 3CMP COMMERCIAL CONSTRUCTION INC2 awards$7.26M
- 4MULE ENGINEERING, INC.1 award$6.75M
- 5SKYTEK LLC1 award$5.43M
- 6AHTNA INFRASTRUCTURE & TECHNOLOGIES LLC2 awards$1.38M
- 7AMERITECH CONTRACTING LLC1 award$968,274
- 8NODAK ELECTRIC & CONSTRUCTION, INC.1 award$870,000
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID db1c8c50026d464eba2a05b417f0a918.