J--SERVER ACOUSTIC ENE, IN REPAIR/MODIFICATION OF
Dept of Defense · DEPT OF THE NAVY
This notice is not accepting responses (deadline was May 27, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- May 27, 2026, 8:00 PM EDT
- Posted
- Apr 27, 2026
- Solicitation
- N0010426QUB56
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH · MECHANICSBURG · PA
- Source
- SAM.gov · updated May 9, 2026
Description
A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to Jordan.d.burt.civ@us.navy.mil B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting. C. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor�s written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. D. Only a firm-fixed (FFP), not-to-exceed (NTE) or estimated (EST) price for the REPAIR of the subject item(s) will be accepted. Quotes limited to test and evaluation (T&E) will NOT be accepted. The quoted price MUST be for the REPAIRof the item(s). E. Must adhere to IUID requirements of DFARS 252.211-7003 F. The ultimate awardee of the proposed contract action must be an authorized repair source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. G. The Government is requesting a Repair Turnaround Time (RTAT) of: 177 days after receipt of asset. Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor�s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Please note freight is handled by Navy CAV as stated in NAVSUPWSSFA24. Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #). A throughput of "0" (zero) per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. H. IMPORTANT NOTE: Reconciliation Price Reduction: Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "Reconciliation Modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government�s right to terminate for default. In reference to the above important note, the contractor provides the followingprice reduction amount per unit/per month the contractor does not meet the RTAT: $___________, up to a maximum of: $__________. (vendor is to fill in amount) I. Your quote MUST include the following information for justification purposes: - Repair unit price ________________ - Total price________________ - Repair Turnaround Time (RTAT) _____________ days - New unit price ______________ NOTE: If you are not quoting the Government�s Requested Repair Turnaround Time (RTAT) or sooner, you must provide your company�s capacity constraints below: ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ - T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR/BER, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. - The T&E fee (if asset is determined BR/BER) was determined based on: ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ - Award to CAGE:________ - Inspection & Acceptance CAGE, if not the same as Award to CAGE: _________ - Facility/Subcontractor CAGE (where the asset should be shipped to), if not same as Award to CAGE. __________ - Facility/Subcontractor or Packaging Facility CAGE (where the asset will be shipped from), if not the same as Award to CAGE. ________ - Cost breakdown requested, including profit rate (if feasible). - Quote expiration date _______________________ (MIN of 90 Days is requested). - Delivery Vehicle (if Delivery Order requested) (if your company has a currentBOA/IDIQ, for example) INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$18,507
Middle of the pack for similar past awards
Most similar awards fall between $6,877 and $50,404
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1MOOG INC1 award$221,583
- 2GRAYBAR ELECTRIC COMPANY, INC.1 award$76,890
- 3ELECTRICAL EQUIPMENT CO1 award$23,919
- 4STRICTLY TECHNOLOGY, LLC3 awards$21,032
- 5FEDDATA TECHNOLOGY SOLUTIONS, LLC1 award$11,728
Recent examples
A few of the newest similar awards in our index.
- STRICTLY TECHNOLOGY, LLCSep 27, 2025Department of State$2,027Source
- ELECTRICAL EQUIPMENT COAug 5, 2025National Aeronautics and Space Administration$23,919Source
- MOOG INCJul 21, 2025National Aeronautics and Space Administration$221,583Source
- STRICTLY TECHNOLOGY, LLCJul 15, 2025Department of State$499Source
- GRAYBAR ELECTRIC COMPANY, INC.Apr 30, 2025National Aeronautics and Space Administration$76,890Source
- FEDDATA TECHNOLOGY SOLUTIONS, LLCMar 18, 2025Department of Veterans Affairs$11,728Source
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID db5cc7009d4b4637b9a298ff0eeef2a2.