Burnsville Rip Rap
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Aug 20, 2025, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Aug 20, 2025, 8:00 PM EDT
- Posted
- Aug 13, 2025
- Solicitation
- W9123725QA054
- Set-aside
- Total Small Business
- Place of performance
- —
- Contracting office
- W072 ENDIST HUNTINGTON · HUNTINGTON · WV
- Source
- SAM.gov · updated May 9, 2026
Description
Contractor shall provide all labor, equipment, and materials required to deliver Stone within 30 days post award, to U.S. Army Corps of Engineers Burnsville Lake Project. Contractor shall notify the government point of contact 5 business days prior to delivery to allow time for the project to get equipment rented to place the stone. The stone being delivered to Falls Mill will need to be delivered on a schedule to reduce the stone having to be rehandled. A maximum of four truck loads can be delivered per day. Two trucks can be delivered between 0800 ? 1000 Eastern Time and the other two trucks can be delivered between 1130 ? 1330 Eastern Time. Delivery to Bulltown Campground shall be scheduled between hours 0800-1430 Eastern Time but does not have a quantity limit per day. All Rip-Rap stone must be clean and meet West Virginia Department of Transportation requirements of the 2000 Standard Specifications, and the 2009 Supplement Standard Specifications under Section 704.2 ? ?Stone For Riprap?. Stone for riprap shall consist of field stone or rough unhewn quarry stone as nearly rectangular in section as is practicable. The material shall have a maximum weighted loss of 30 percent when subjected to five cycles of sodium sulfate soundness test. A letter must be provided prior to delivery stating the Rip Rap meets the specifications. Stone Quantity and Type: 1. 500 Tons of 12?24-inch Rip Rap delivered to Falls Mill2. 50 Tons of 3-inch crusher Run delivered to Falls Mill3. 250 Tons of 6?12-inch Rip Rap delivered to Bulltown Campground 4. 400 Tons of 57 clean gravel delivered to Bulltown Campground
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$361,874
Middle of the pack for similar past awards
Most similar awards fall between $153,288 and $2.23M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1PINTER MEMORIALS INC11 awards$26.82M
- 2VETERANS MONUMENT COMPANY, LLC13 awards$19.56M
- 3AMERICAN VETERAN CONTRACTING SOLUTIONS LLC5 awards$17.19M
- 4COLUMBUS MARBLE WORKS, INC.12 awards$12.84M
- 5JMG VETERAN CONTRACTING LLC3 awards$12.66M
- 6HILLCREST GRANITE CO9 awards$10.38M
- 7MATTHEWS INTERNATIONAL CORPORATION1 award$8.79M
- 8J.B. PROCESSING, LLC2 awards$6.50M
Recent examples
A few of the newest similar awards in our index.
- MCCUE MEMORIAL CO., INC.Sep 27, 2025Department of Veterans Affairs$47,104Source
- AMERICAN VETERAN CONTRACTING SOLUTIONS LLCSep 27, 2025Department of Veterans Affairs$3.55MSource
- RONALD DANELSep 25, 2025Department of Veterans Affairs$473,040Source
- VETSUSA LLCSep 25, 2025Department of Veterans Affairs$307,818Source
- D MOORE AND SON MONUMENTS LLCSep 25, 2025Department of Veterans Affairs$242,393Source
- VETSUSA II INC.Sep 25, 2025Department of Veterans Affairs$219,353Source
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID f5947fc6cdfd47d8874f87fd72f4070e.