Replacement of Backup Generator, Fuel Tank, and Automatic Transfer Switch
Agriculture, Department of · ANIMAL AND PLANT HEALTH INSPECTION SERVICE
This notice is not accepting responses (deadline was Apr 16, 2026, 6:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Apr 16, 2026, 6:00 PM EDT
- Posted
- Mar 17, 2026
- Solicitation
- 12639526Q0074
- Set-aside
- Total Small Business
- Place of performance
- Honolulu, HI, USA
- Contracting office
- MRPBS MINNEAPOLIS MN · MINNEAPOLIS · MN
- Source
- SAM.gov · updated Jul 5, 2026
Description
The USDA Medfly Preventative Release Program requires the complete removal and disposal of the existing backup generator (C100D6C Diesel Genset, 60Hz, 100kW) and Automatic Transfer Switch (ATS) (CBLC, Bypass Transfer Switch?Power Command: 150A/225A/260/300/400/600A), along with the removal and disposal of the associated diesel fuel tank, diesel fuel, and concrete equipment pad. This requirement includes furnishing and installing a new diesel?powered backup generator, a new Automatic Transfer Switch (ATS), a new diesel fuel tank with fuel, and a new concrete pad, as well as all items required to completely install, test, and commission the equipment in accordance with the Statement of Work. The new generator must provide a minimum standby capacity of 100 kW, equal to the existing system. Generators with capacities greater than 100 kW are acceptable and may be proposed, provided they meet all compatibility, site, electrical, and operational requirements outlined in the Statement of Work. Work includes, but is not limited to: � Decommissioning, removal, and proper disposal of the existing generator system, ATS, diesel fuel tank, diesel fuel, and concrete pad; � Furnishing and installing a new generator, ATS, diesel fuel tank, and new concrete pad; � All mechanical, electrical, piping, exhaust, grounding, controls, and associated work required for a complete and functional system; � Supplying up to 550 gallons of new diesel fuel for startup, testing, and commissioning; � Startup, testing, and commissioning of the new system; and � Providing all submittals, shop drawings, manuals, warranties, as?builts, and required training; The solicitation documents are posted below.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$42,495
Middle of the pack for similar past awards
Most similar awards fall between $17,977 and $136,203
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1SPECTRUM ELECTRICAL SERVICES, INC1 award$3.07M
- 2EATON CORPORATION2 awards$2.81M
- 3CE POWER ENGINEERED SERVICES, LLC1 award$1.72M
- 4CTC TECHNOLOGIES, INC.2 awards$1.36M
- 5J L BASS ENTERPRISE LLC1 award$1.30M
- 6THE TRIM GROUP LLC1 award$1.13M
- 7ACCESS COMMUNICATIONS GROUP, LLC1 award$1.09M
- 8THE THIRD ELEMENT, INCORPORATED1 award$1.03M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.