WATER SYSTEM FAULTY PROGRAMMABLE LOGIC CONTROLER REPLACEMENT
State, Department of · STATE, DEPARTMENT OF
- Response deadline
- Jul 18, 2026, 12:00 AM UTC
- Posted
- Jun 22, 2026
- Solicitation
- 19BY7026Q0010PR16053183
- Set-aside
- No Set aside used
- NAICS
- 811Repair and MaintenanceT
- PSC
- H946OTHER QC/TEST/INSPECT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT
- Place of performance
- Bujumbura, BDI
- Contracting office
- U.S. EMBASSY BUJUMBURA · WASHINGTON · DC
- Source
- SAM.gov · updated Jun 23, 2026
Description
The U.S. Embassy in Bujumbura, Burundi, has a requirement to replace the faulty Programmable Logic Controller (PLC) of its Domestic Water Treatment Plant (DWTP) and integrate BACnet communication to enable connectivity with the Building Automation System (BAS). This upgrade will allow the Facilities Team to monitor water levels, production, and distribution to Embassy buildings in real time, in accordance with the attached Statement of Work (SOW). The existing PLC, an Allen-Bradley MicroLogix 1200, has experienced a fatal internal failure and must be replaced. All interested vendors are requested to submit their best and final quotation no later than July 18, 2026, at 10:00 a.m. Bujumbura time, for the following requirement: Domestic Water Treatment Plant (DWTP) System � PLC Supply, Installation, Programming, Integration, Testing, and Commissioning Services Vendors must provide a detailed and itemized price quotation. Lump-sum or incomplete pricing that does not clearly identify individual components and services may not be considered during the evaluation process. Each line item should include sufficient detail for technical and price analysis. The quotation should, at a minimum, include the following categories: 1. Staff Services Technical personnel Labor costs Travel expenses Accommodation and per diem (if applicable) Engineering and programming services Testing and commissioning services 2. Materials and Equipment PLC hardware and accessories BACnet communication modules and interfaces Software licenses (if applicable) Control panels, cables, connectors, and related components Any additional equipment required for a complete installation 3. Installation and Commissioning Removal of existing PLC Installation of new PLC and associated equipment Programming and system configuration BAS integration and BACnet communication setup Functional testing System commissioning Operator training and documentation Please ensure that all proposed equipment and services comply with the requirements specified in the attached Statement of Work. For any question, please send it to: NiyongaboS@state.gov with title: 19BY7026Q0010 Question Questions will be compiled until July until June 30, 2026 and answers will be posted on sam.gov on July 3, 2026.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Not enough similar awards to show a range yet
Fewer than five matching public awards are in our index for this lane — not enough to show a fair range.
We looked for: Same industry code (811) · Same product/service code (H946) · Prime contracts (not umbrella IDVs)
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID f6cb6a21eb1948848158a18d8378f4a2.