Federal contractor · public award history
SHARMA & ASSOCIATES INC
Parent: SHARMA & ASSOCIATES INC XS8EY6SAANS6
- Awards we know about
- 32
- Typical size
- $322,578
- Middle of their public awards
- Dollars on those awards
- $14.33M
Most of their awards we can see fall roughly between $190,349 and $473,775.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$3.05M
- 2025$11.62M
Awarding agencies
- Department of Transportation (31)
- General Services Administration (1)
Industries & product codes
Award history
- Department of Transportation$203,782
THE PURPOSE OF THIS STAND-ALONE CONTRACT IS TO PROVIDE FUNDING FOR THE RESEARCH AND DEVELOPMENT OF AN INNOVATIVE ALGORITHM DEVELOPMENT TO IDENTIFY DERAILMENT RISKS USING RAIL PROFILES AND TRACK GEOMETRY. ONCE DEVELOPED, THIS ALGORITHM WILL BE INTEGRA
- General Services Administration—
SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT ANDFAR PART 2. PES DOES NOT INCL
- Department of Transportation$322,578
::OTHER FUNCTION::RESEARCH INDEPENDENT POWER GENERATION FOR COMPONENTS AND SYSTEMS IN FREIGHT APPLICATIONS.
- Department of Transportation$3.36M
RISK REDUCTION THOUGH IMPROVED TRAIN MAKEUP AND TRAIN HANDLING LONG-TRAINS
- Department of Transportation$349,760
::OTHER FUNCTION:: APP 094 LOCOMOTIVE EMISSIONS TESTING SYSTEMS
- Department of Transportation$249,760
LOCOMOTIVE OPERATING PRACTICES RESEARCH TO REDUCE DERAILMENT/COLLISION RISK THROUGH IMPROVED TRAIN MAKE-UP AND TRAIN HANDLING. TEDS AND OTHER SIMULATION PROGRAM WILL BE USED. RECENT ACCIDENTS CAUSED BY POOR TRAINMAKE UP AND TRAIN HANDLING WILL BE EXAMINED TO PRESCRIBE BETTER PROCEDURES. THESE CAN LEAD TO GUIDELINES WHICH THE OFFICE OF AFETY HAS LONG SOUGHT.
- Department of Transportation$349,547
THE MISSION OF THIS PROPOSED RESEARCH AND DEVELOPMENT PROJECT IS TO INVESTIGATE FIRE TESTING NEEDS IN THE RAILROAD AND ENERGY INDUSTRIES, DEVELOP A PLAN FOR SUCH TEST FACILITIES, AND FURTHER TO DEVELOP THE TEST FACILITIES AT THE TTC OR OTHER SUITABLE
- Department of Transportation$124,620
THIS FIRM FIXED PRICE (FFP) PURCHASE ORDER (PO) IS ISSUED FOR SHARMA & ASSOCIATES INC. TO CONDUCT POOL FIRE TEST FOR DOT-112 TANK CARS THERMAL PROTECTION SYSTEM.
- Department of Transportation$299,436
TOPIC: FRA-TR-006 - TRACK/TRAIN DYNAMIC SIMULATIONS OF MULTI-VEHICLE CONSIST.
- Department of Transportation$432,800
THE PURPOSE OF THIS CONTRACT IS TO PROVIDE VERY LONG TRAIN (VLT) COLLABORATION STUDY FOLLOW-ON AND TO EVALUATE SAFETY AND PERFORMANCE OF VLT UNDER AN EXTENDED SET OF OPERATING CONDITIONS
- Department of Transportation$527,953
IGF::OT::IGF FRA R&D SEEKS TO FURTHER REFINE THIS PROTOTYPE SAFETY RISK MODEL. IN THE CURRENT MODEL IDENTIFIED HAZARDS HAVE BEEN CHARACTERIZED IN TERMS OF FREQUENCY AND CONSEQUENCE. FREQUENCY METRICS ARE DERIVED FROM NATIONAL RAILROAD OPERATIONAL ATTRIBUTES (SUCH AS ANNUAL TRAIN MILES, FOR EXAMPLE). HAZARD CONSEQUENCES ARE EXPRESSED IN TERMS OF FATALITIES, INJURIES, NUMBERS OF EVACUEES (IN THE CASE OF HAZARDOUS MATERIALS EVENTS) AND PROPERTY DAMAGE. RISK, DEFINED AS THE PRODUCT OF FREQUENCY AND CONSEQUENCE FOR A GIVEN HAZARD, IS OBTAINED DIRECTLY. THE SRM WILL PERMIT RANKING OF INDIVIDUAL HAZARDS AND PROVIDE AN INDICATION OF WHERE R&D PROJECT INVESTMENTS MAY HAVE GREATEST INFLUENCE ON IMPROVING SAFETY.
- Department of Transportation$698,779
R&D TO HELP FRA INDEPENDENTLY ASSESS BNSF'S IMPLEMENTATION OF WAYSIDE WHEEL TEMPERATURE DETECTOR (WTD) TECHNOLOGY.
- Department of Transportation$1.15M
THE CONTRACTOR WILL PROVIDE TIMELY TECHNICAL SUPPORT TO THE OFFICE OF SAFETY IN ITS ROLE OF INVESTIGATING RAILROAD INCIDENTS AND EVALUATING RULE-MAKING DECISIONS AFFECTING RAILROAD OPERATIONS SAFETY. THE SUPPORT EFFORT WILL INCLUDE CONDUCTING TEDS S
- Department of Transportation$498,000
DEVELOP AND PROTOTYPE A REPEATABLE TEST SETUP THAT CAN USED FOR IMPACT AND PUNCTURE TESTING OF SMALL-SCALE TANK CARS.
- Department of Transportation$395,706
CONDUCT FIRE TESTING ON TANK CARS.
- Department of Transportation$332,872
PROVIDE TECHNICAL SUPPORT FOR THE WAYSIDE SYSTEM EVALUATION EFFORT WITH METRONORTH AND LONG ISLAND RAILROAD IN SUPPORT OF THE OFFICE OF SAFETY.
- Department of Transportation$45,264
IGF::OT::IGF "ANALYSIS OF ADDITIONAL DATA COLLECTED DURING BRIDGE AND TRACK TESTS UNDER STEAM LOCOMOTIVE OPERATIONS"
- Department of Transportation$1.10M
FRA WILL PROVIDE CONTINUED SUPPORT FOR THE LNG RULEMAKING EFFORT.
- Department of Transportation$1.10M
IGF::OT::IGF EVALUATING PERFORMANCE OF TANK CAR PRESSURE RELIEF DEVICES UNDER FIRE CONDITIONS
- Department of Transportation$28,250
IGF::OT::IGF - SERVICES TO PRODUCE AND PACKAGE A DVD WITH THE TRAINING MODULE, RAIL SAFETY INCIDENT INVESTIGATION.
- Department of Transportation$36,642
IGF::OT::IGF THE PRIMARY PURPOSE OF THIS EFFORT IS TO ENLIST CONTRACTOR SUPPORT TO IDENTIFY CANDIDATE DATA SETS OR ELEMENTS WHICH MAY BE APPROPRIATE FOR MAKING PUBLICLY AVAILABLE ON THE DATA.GOV WEBSITE.
- Department of Transportation$217,669
IGF::OT::IGF THE SCOPE INCLUDES MODIFICATIONS TO THE BAG GEOMETRY, SELECTION OF APPROPRIATE AIR BAG MATERIAL FOR IMPROVED PERMEABILITY, A PASSIVE VENTING SYSTEM AND SELECTION AND INCORPORATION OF AN APPROPRIATE INFLATOR PROVIDING SUFFICIENT GAS FOR INFLATION OF THE BAG DURING IMPACT AND COMPENSATING FOR THE DESIRED VENTING DURING INFLATION AND DECELERATING THE ATD IN A MANNER WHICH RESULTS IN SUCCESSFULLY MEETING THE INJURY CRITERIA.
- Department of Transportation$176,915
IGF::OT::IGF THEREFORE, ADDITIONAL SCOPE AND FUNDING IS NEEDED TO FULLY EXECUTE THE RESEARCH INTENT. THE ADDITIONAL EFFORT NEEDED SHOULD INCLUDE FABRICATION OF THE TEST FIXTURES, AS WELL AS THE TESTING OF A BASELINE GLAZING SYSTEM AND TWO PROTOTYPES UNDER THE FOLLOWING TEST CONDITIONS: * THE GASKET EDGE PRYING TEST * THE NORMAL FORCE RETENTION TEST, AND * THE BALLAST DRAG TEST
- Department of Transportation$274,447
NEW ELECTRONIC BRAKING TECHNOLOGY RESEARCH
- Department of Transportation$449,550
THIS PROPOSED RESEARCH AND DEVELOPMENT PROJECT IS PLANNED TO: (1) DETERMINE, IN LIEU OF ECP IMPLEMENTATION, THE BEST PRACTICAL AND COST EFFICIENT METHOD TO INCREASE FREIGHT TRAIN AIR BRAKE SIGNAL PROPAGATION SPEEDS AND (2) TO DESIGN, DEVELOP AND TES
- Department of Transportation$286,366
IGF::OT::IGF - CRASHWORTHINESS FOR LEGACY LOCOMOTIVES PHASE III
- Department of Transportation$395,474
DEVELOPMENT OF NEXT GENERATION BRAKE TECHNOLOGY TO IMPROVE SAFETY AND EFFICIENCY OF FREIGHT RAIL TRANSPORTATION. RESEARCH WILL FOCUS ON RUGGEDIZING AVAILABLE TECHNOLOGY FOR RAIL ENVIRONMENT
- Department of Transportation$164,380
IGF::OT::IGF - R&D TANK CAR FITTINGS - EVALUATE DIFFERENT TOP FITTINGS OF NEW TANK CAR DESIGNS TO IMPROVE RESISTANCE TO FAILURE DURING ROLLOVER.
- Department of Transportation$120,585
THE FRA OFFICE OF RESEARCH, DEVELOPMENT, TESTING (ORD&T), RESEARCH, DEVELOPMENT , TEST, AND EVALUATION (RDT&E) SUPPORT CONTRACT REQUIRES OVERALL MANAGEMENT AND ADMINISTRATION SERVICES TO ASSURE PROPER COORDINATION OF ACTIVITIES BETWEEN ALL THE AWARDED TASKS. A SINGLE GENERAL MANAGEMENT TASK WILL BE ASSIGNED TO PROVIDE OVERALL GUIDANCE AND COORDINATION FOR THE OTHER ASSIGNED TECHNICAL TASKS.
- Department of Transportation$297,154
IGF::OT::IGF THE OBJECTIVES OF THIS EFFORT ARE TO PREPARE AN EXTENDED SET OF VEHICLE SIMULATION RESULTS THAT CAN BE USED TO GUIDE DERAILMENT INVESTIGATIONS, ESPECIALLY ONES IN WHICH INDIVIDUAL VEHICLE DYNAMICS AND WHEEL/RAIL FORCES MAY HAVE A PLAYED A KEY ROLE IN DERAILMENT INITIATION.
- Department of Transportation$154,281
IGF::OT::IGF RESEARCH, TEST, AND ENGINEERING SUPPORT FOR PRIIA 305 COMMITTEE - ELECTRONICS
- Department of Transportation$513,377
COUPLER TORSIONAL STRENGTH RESEARCH
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.