Federal contractor · public award history
JBG/FEDERAL CENTER, L.L.C.
Parent: JBG PROPERTIES, INC. R73JMEX51JH9
- Awards we know about
- 13
- Typical size
- $26,007
- Middle of their public awards
- Dollars on those awards
- $469,829
Most of their awards we can see fall roughly between $7,980 and $31,426.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- Department of Transportation (13)
Industries & product codes
Award history
- Department of Transportation$120,000
IGF::OT::IGF REQUEST FOR A BPA CALL AGAINST THE JBG BPA # DTOS59-11-A-00007, TO PERFORM CIRCUIT TRACING THROUGHOUT THE ENTIRE WEST BUILDING, TO INCLUDE; NEW PANEL SCHEDULES,LABELING OF SYSTEM FURNITURE FEEDS, AND IDENTIFY EXISTING FURNITURE FEED PROBLEMS.
- Department of Transportation$28,687
IGF::OT::IGF - PO TO FURNISH AND INSTALL THREE HUNDRED FORTY TWO (342) FOLDING UTILITY SHELVES IN THE MENS AND WOMEN RESTROOMS AT THE USDOT HEADQUARTERS BUILDING, EAST AND WEST BUILDINGS
- Department of Transportation$100,000
IGF::OT::IGF - FUNCTIONS: BPA CALL REQUEST
- Department of Transportation$6,783
IGF::OT::IGF BPA CALL FOR AIR FLOW MODIFICATIONS AND SPACE TEMPERATURE SENSORS SERVICES, IN THE USDOT FHWA CIVIL RIGHTS OFFICE IN THE USDOT WEST BUILDING.
- Department of Transportation$26,007
IGF::OT::IGF BPA CALL- FOR THE NINTH FLOOR, USDOT HQS BLDG IN WASHINGTON, D.C. - INTERNATIONAL LAW 1 D SIZE OFFICE MODIFICATION. THIS WORK INCLUDES BUT IS NOT LIMITED TO OBTAINING THE NECESSARY PERMITS, TEARING DOWN THE EXISTING OFFICE STRUCTURE, REMOVING FURNITURE, DESIGNING 1 D SIZED OFFICE SPACE, MAKING REQUIRED ELECTRICAL CHANGES TO SUPPORT THE NEW OFFICES, AND CONSTRUCTING THE OFFICES. THE WALLS FOR THE OFFICES MUST BE CONSTRUCTED TO THE EXISTING CEILING.
- Department of Transportation$31,159
IGF::OT::IGF CALL ORDER NEW REPLACEMENT DOOR
- Department of Transportation$377
IGF::CT::IGF THIS IS A CALL OFF BPA DTOS59-11-A-00007 TO FURNISH AND INSTALL ONE OLD STYLE ELECTRICAL WORKBOX, RELOCATE EXISTING CIRCUIT TO NEW LOCATION, INSTALL SWITCH NEXT TO THE DOORWAY, AND CLEAN UP THE ARE AFTER COMPLETION.
- Department of Transportation$31,426
IGF::CL::IGF
- Department of Transportation$90,352
IGF::OT::IGF - OTHER FUNCTIONS FURNISH AND INSTALL NEW BARRIER LOOPS AND TRAFFIC ARMS FOR ALL FOUR (4) LANES
- Department of Transportation$7,980
IGF::OT::IGF THE PURPOSE OF MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 3/31/2016 TO 09/30/2016.
- Department of Transportation$6,407
MODIFICATION 0003-CHANGE LABOR CATEGORY
- Department of Transportation$8,749
IGF::OT::IGF THIS PROCUREMENT REQUEST IS TO COVER THE COST AND INSTALLATION PERIODS FOR REPLACING THE INTERNATIONAL LAW OFFICE ENTRYWAY WITH A GLASS DOOR. THE EXISTING WOODEN DOORWAY WOULD BE PLACED WITH A STANDARD ALUMINUM GLASS DOOR AND FRAME. THE EXISTING AUTOMATIC OPERATOR WOULD BE REUSED FOR THE NEW GLASS DOOR. THE NEW FRAME WOULD REQUIRE THE REWORK OF THE CARD READER AND MAGLOCKS FOR BY THE SELECTED SECURITY VENDOR. A STANDARD STENCILED SIGN IS REQUIRED FOR THE DOORWAY. THE EXISTING BACK ENTRYWAY WOULD REMAIN AS CURRENTLY BUILT. ALL HARDWARE AND PAINT FINISHES WILL MATCH THE EXISTING MATERIAL USED WITH THE DOT COMPLEX. THE MATERIALS WOULD HAVE A TIME OF 9 NINE WEEKS LEAD TIME BEFORE ARRIVING AT THE CONSTRUCTION TEAM'S WAREHOUSE. THIS ROM DOES NOT INCLUDE ANY UNFORESEEN CONSTRUCTION ENVIRONMENTS THAT MAY IMPACT THE PRICING OF THIS PROJECT. THE GLASS DOOR AND AUTOMATIC OPENER PROCUREMENT IS APPROXIMATELY SEVEN WEEKS.
- Department of Transportation$11,902
IGF::OT::IGF
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.