Federal contractor · public award history
GREAT WEST ENGINEERING INC
Parent: GREAT WEST ENGINEERING INC YM6DLZAMCJB7
- Awards we know about
- 50+
- Typical size
- $125,341
- Middle of their public awards
- Dollars on those awards
- $10.76M
Most of their awards we can see fall roughly between $86,024 and $248,212.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- Department of Agriculture (32)
- Department of the Interior (18)
Industries & product codes
Award history
- Department of Agriculture$49,569
DESIGN, BUILDING 24 BASEMENT REMODEL, REGION 1 CIVIL AE MATOC
- Department of the Interior$246,806
TIMPANOGOS CAVE NATIONAL MONUMENT TICA 163246 REPLACE TOILETS AT CAVE ENTRANCE DESIGN SERVICES FOR PREDESIGN (PD) AND SCHEMATIC DESIGN (SD) DOCUMENTS
- Department of Agriculture$1,000
PPS NWZ ARCHITECTURE AND ENGINEERING (AE) IDIQ
- Department of the Interior$128,222
TITLE I SCOPING SERVICES - REHABILITATE KELLY POINT ROAD IN THE HORSE VALLEY AREA, GRAND CANYON - PARASHANT NATIONAL MONUMENT, ARIZONA, PMIS# 230602
- Department of Agriculture$122,217
DESIGN OF A HYDRAULIC CULVERT AT THE SITE 18.89 MILES UP THE 101 ROAD, ADJACENT TO AN AOP STRUCTURE. STREAM CHANNEL IS TOO STEEP ABOVE THIS CULVERT FOR GOOD FISH HABITAT. CULVERT SHOULD BE SIZED TO ACCOMMODATE THE 100 YEAR FLOOD FLOW EVENT, IF FISH
- Department of Agriculture$58,362
DISASTER RELIEF #15-5.78 RIMROCK TRAIL BRIDGE REPLACEMENT DESIGN WPAP 663577
- Department of the Interior$205,940
COMPLETE HISTORIC STRUCTURES REPORT FOR SUTLER'S STORE HS-02, OFFICERS QUARTERS E HS-06, OFFICERS QUARTERS A HS-07, FORT LARAMIE NHS FOLA PMIS 3274461
- Department of Agriculture$241,090
GAOA 6CQ SULLIVAN LAKE WATER SYSTEM DESIGN
- Department of the Interior$238,517
BIGHORN CANYON NATIONAL RECREATION AREA (BICA) PMIS #254703 REPLACE EWING-SNELL RANCH HOUSE AS SCIENCE & CULTURAL FACILITY DESIGN SERVICES FOR DESIGN DEVELOPMENT (DD) AND CONSTRUCTION DOCUMENTS (CD)
- Department of the Interior$152,853
TITLE II DESIGN DEVELOPMENT AND FINAL CONSTRUCTION DOCUMENTS SERVICES, REHABILITATE HOUSEKEEPING CAMP LIFT STATION, YOSEMITE NATIONAL PARK, CALIFORNIA
- Department of the Interior$159,528
PIRO 322515 - SAND POINT TRAIL - PD-SD A
- Department of Agriculture$278,459
THE PURPOSE OF THIS PROJECT IS TO DESIGN 3 AQUATIC ORGANISM PASSAGE STRUCTURES (AOPS) ON THE BITTERROOT NATIONAL FOREST. THESE CROSSINGS ARE CURRENTLY UNDERSIZED CULVERTS THAT ACT AS BARRIERS TO FISH PASSAGE. THE PROJECT WILL ALSO DESIGN 3 BRIDGE R
- Department of Agriculture$813,541
COMPLETE FULL DESIGN CWI FY22 AQUATICS-AOP DESIGN CLE ELUM AND NACHES
- Department of the Interior$744,471
DEVA 334807 - DEATH VALLEY DARWIN FALLS
- Department of Agriculture—
REGION 1 STRUCTURAL, CIVIL, WATER&WASTEWATER INSPECTION AND DESIGN (SCWWID) IDIQ
- Department of Agriculture$120,409
HLF GAOA GRASSHOPPER CREEK AND MILL FALLS CAMPGROUND S&D
- Department of the Interior$683,849
DEVA 335322 CONVERT FLOOD DAMAGED LOWER
- Department of Agriculture$134,401
SURVEY AND DESIGN MULTIPLE DEFICIENT BRIDGE REPLACEMENTS 2025
- Department of Agriculture$117,482
PROFESSIONAL ENG TECHNICAL SERVICES - GREAT WEST - REGION 1 - "ON-CALL"
- Department of Agriculture$118,839
AFD LAGOON DECOMMISSIONING DESIGN
- Department of Agriculture$106,458
712824 AND 712859 MT & ID TIMBER SALE ROAD SURVEYS 2025 ENGINEERING AND SURVEY SERVICES TO PERFORM ROAD SURVEYS AND PRESCRIBE NEEDED WORK TO FACILITATE LOGGING OPERATIONS ON ROADS ASSOCIATED WITH FUTURE TIMBER SALE PROJECTS.
- Department of the Interior$309,900
VAFO-319401-VALLEY CREEK TRAIL DD/CD-DS
- Department of Agriculture$249,026
TASK ORDER ON STRUCTURAL, CIVIL, WATER & WASTEWATER INSPECTION AND DESIGN (SCWWID) IDIQ FOR SURVEY AND DESIGN OF AQUATIC ORGANISM PASSAGES (AOPS) FOR THE ST JOE RANGER DISTRICT IN IDAHO PANHANDLE NATIONAL FOREST
- Department of Agriculture$1.34M
GAOA MULTNOMAH FALLS LODGE DESIGN UPGRADES
- Department of the Interior$89,299
CANE-329235 REPLACE SEPTIC-DESIGN
- Department of Agriculture$96,375
USE A T.O. TO CONTRACT OUT LOLO NF REMAINING ROUTINE BRIDGE INSPECTIONS
- Department of Agriculture$31,595
GAOA LOLO CIVIL A&E MISSION SUPPORT SERVICES - GREAT WEST
- Department of Agriculture$122,461
THE CONSULTANT SHALL COMPLETE ROAD SURVEYS ON EXISTING ROAD TEMPLATES IN PREPARATION FOR VEGETATION MANAGEMENT PROJECTS (TIMBER SALES). SALES MAY BE ACROSS REGION 1. INITIALLY SALES WILL BE ON THE IDAHO PANHANDLE AND KOOTENAI NATIONAL FORESTS. SIX
- Department of the Interior$100,190
TITLE I AE SERVICES, REHABILITATE THE OLD EL PORTAL DEBRIS BASIN, GABION, AND SERVICE ROAD, YOSEMITE NATIONAL PARK, CALIFORNIA
- Department of Agriculture—
LAND MANAGEMENT INTEGRATED RESOURCES (LMIR) BPA
- Department of the Interior$51,256
MORR PASSAIC BRIDGE - TITLE III SERVICES
- Department of Agriculture$108,079
GAOA REPAIR THREE (3) HISTORIC ROUTES / ASSOCIATED REC SITES, NEZ PERCE-CLEARWATER NATIONAL FORESTS.
- Department of Agriculture$247,940
SULLIVAN LAKE REALIGNMENT AND REHABILITATION A-E REQUISITION AAP #606294
- Department of Agriculture$149,150
GAOA - GREAT WEST ENG - TASK ORDER FOR TITLE II SERVICES FOR GAOA PROJECTS (CONTRACT NO. 12034320D0038)
- Department of Agriculture$11,879
GAOA - A&E, SAVENAC WATER SYSTEM REPLACEMENT REDESIGN, FACILITY
- Department of Agriculture$102,300
TASK ORDER FOR NSTM BRIDGE INSPECTIONS USING DOI/FS MATOC 140F0822D0244
- Department of Agriculture$750,309
LOAD RATING ANALYSIS FOR BRIDGES
- Department of the Interior$340,209
AMME 325975 COMPLIANCE TASK ORDER
- Department of Agriculture$274,336
R1 IDIQ CIVIL/STRUCTURAL DESIGN FOR SAWMILL CREEK, TOWNSEND CREEK, NORTH FORK DICK CREEK AOPS AND ROARING FORK ROAD IMPROVEMENT SHOSHONE NF
- Department of Agriculture$63,986
A&E - LOLO TIMBER SALE PRELIMINARY DESIGN - 12034320D0038 REGION 1, STRUCTURAL, CIVIL, WATER & WASTEWATER INSPECTION AND DESIGN IDIQ
- Department of Agriculture$55,867
CIM23 LONG PINES ACCESS AND BOX ELDER AOP ENGINEERING SERVICES FINAL PS&E
- Department of the Interior$10,000
NW IDIQ - GENERAL ENGINEERING SERVICES - SMALL POOL
- Department of Agriculture$428,778
JOHN DAY BASIN AOP DESIGNS
- Department of Agriculture$76,200
GAOA THIS PROJECT IS FOR COMPLETE ENGINEERING DESIGN PACKAGE FOR THE RECONSTRUCTION AND IMPROVEMENT OF THE DELMOE LAKE CAMPGROUND AND BOAT LAUNCH ON THE BEAVERHEAD-DEERLODGE NATIONAL FOREST, BUTTE RANGER DISTRICT.
- Department of the Interior$48,884
DESIGN: BUILD PARKING AT FEE CHURCH
- Department of the Interior$479,465
AMME 325975, ARCHITECTURAL & ENGINEERING (AE) SERVICES, REPLACE AND RELOCATE FAILING WATERLINES, AMERICAN MEMORIAL PARK, SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS
- Department of Agriculture$103,856
IIJA - THIS PROJECT CONSISTS OF SURVEY AND DESIGN FOR TWO DIFFERENT CULVERT/AOP REPLACEMENTS ON RESERVOIR CREEK, AS WELL AS SURVEY AND DESIGN OF RECONSTRUCTION/REPAIR OF WARMS SPRINGS CREEK ROAD TO ALLOW FOR PROPER DRAINAGE. AS PART OF THIS TASK ORDE
- Department of the Interior$149,839
ALPO - STABILIZE STAPLE BEND TUNNEL A/E SERVICES
- Department of the Interior$70,291
DEVA 335332 SCOPING TRIP CONVERT FLOOD-DAMAGED LOWER WILDROSE TO A GRAVEL ROAD
- Department of Agriculture$173,136
GAOA 3121-0.01 MARKLEY ROAD BRIDGE REPLACEMENT DESIGN 1DU WPAP 655523
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.