Federal contractor · public award history
GUARDIAN CONSTRUCTION, INC.
Parent: GUARDIAN CONSTRUCTION, INC. G1DMJZKBDRZ5
- Awards we know about
- 31
- Typical size
- $1.22M
- Middle of their public awards
- Dollars on those awards
- $65.73M
Most of their awards we can see fall roughly between $715,234 and $2.95M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$130,153
- 2025$65.60M
Awarding agencies
- Department of Transportation (16)
- Department of the Interior (10)
- General Services Administration (3)
- Department of Agriculture (2)
Industries & product codes
Award history
- Department of Transportation—
SMALL BOA CSA - GUARDIAN
- Department of Transportation—
SMALL BOA ESA - GUARDIAN
- Department of Transportation—
SMALL BOA WSA - GUARDIAN
- Department of Transportation$3.23M
REPLACE HVAC AT SBN ATCT, SOUTH BEND INTERNATIONAL AIRPORT, SOUTH BEND, IN
- Department of Transportation$708,942
DOOR REPLACEMENT AND RECORE/REKEY PROJECT AT FAA'S DENVER AIR ROUTE TRAFFIC CONTROL CENTER IN LONGMONT, COLORADO.
- Department of Transportation$1.41M
REPLACEMENT OF FOUR (4) WATER-TO-WATER HEAT PUMPS LOCATED AT THE OAKLAND AIRPORT, CALIFORNIA.
- Department of Transportation$503,064
UPGRADE FLS & FALL PROTECTION SYSTEMS, SLC ATCT, UT
- Department of Transportation$131,539
THE WORK OF PROJECT IS DEFINED BY THE CONTRACT DOCUMENTS AND CONSISTS OF THE FOLLOWING: 1. DEMO EXISTING ROOF, SOFFIT AND FASCIA, TRIM, AND UNUSED PENETRATIONS THROUGH THE ROOF. A. THIS WILL INVOLVE BOTH LEAD AND ASBESTOS ABATEMENT. CONTRACTOR IS R
- Department of Transportation$1.02M
DENVER AIRPORT TRAFFIC CONTROL TOWER (DEN ATCT) FIRE AND LIFE SAFETY LIFECYCLE REPLACEMENT (FLS)
- General Services Administration$3.03M
AWARD OF 47PK1724C0019, OTAY MESA PEDESTRIAN WALKWAY REPLACEMENT, U.S. LAND PORT OF ENTRY- OTAY MESA MAIN BUILDING, 2500 PASEO INTERNACIONAL, SAN DIEGO, CA
- Department of Transportation$1.30M
REPLACE AIR HANDLING UNITS 510, 515 AND 520 AT THE MINNEAPOLIS AIR ROUTE TRAFFIC CONTROL CENTER (ZMP ARTCC), FARMINGTON, MN
- Department of Transportation$10.86M
DIA ATCT MODERNIZATION
- Department of Transportation$910,711
DEMOLISH AND REPLACE FOUR COMPUTER ROOM AIR CONDITIONER UNITS, REPLACE ASSOCIATED PIPING, AND RELATED ELECTRICAL UPGRADES AT SALT LAKE CITY ARTCC - SALT LAKE CITY, UTAH
- Department of the Interior$4.24M
CRMO 323904, REHABILITATE OPERATIONAL BUILDINGS AT IDAHO PARKS
- Department of Transportation$137,641
CABINET REPLACEMENT FOR SALT LAKE CITY AIR ROUTE TRAFFIC CONTROL CENTER CHILD CARE FACILITY
- Department of the Interior$2.72M
GRAND TETON NATIONAL PARK - TRAIL CONNECTOR PATHWAY
- Department of Agriculture—
USFS REGION 2 ROAD AND BRIDGE CONSTRUCTION MATOC
- Department of the Interior$913,499
REPLACE ALAN BIBLE VISITOR CENTER HVAC AND ROOF AT LAKE MEAD NATIONAL RECREATION AREA IN BOULDER CITY, NEVADA.
- Department of the Interior$563,410
GRCA 318719 ENHANCED CORROSION CONTROL FULL SCALE TEST THE CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS AND EQUIPMENT TO COMPLETE ALL WORK IN THE ALL SECTION J ATTACHMENTS. CO: JAMES WALLER CS: KRISTIN TAUBER COR: CHRIS CARPENTER DELIVERY: 0
- Department of the Interior$17.20M
GRCA 250440 SHUTTLE BUS FACILITY DESIGN BUILD
- Department of the Interior$4.41M
PAIS 242031 REPLACE OBSOLETE HOUSING PADRE ISLAND NATIONAL SEASHORE PADRE ISLAND, TX
- Department of the Interior$4.42M
NATIONAL PARK SERVICE (NPS) DENVER SERVICE CENTER (DSC) CAVE 238210 - CARLSBAD CAVERNS NATIONAL PARK, CARLSBAD NM
- Department of Agriculture—
USFS, REGION 4, ROAD AND BRIDGE CONSTRUCTION MATOC
- Department of the Interior$1.65M
TETON DAM 50TH COMMEMORATION OVERLOOK PROJECT
- General Services Administration$1.37M
PROCURE AND INSTALL FIRE ALARM SYSTEM. LOCATION: CLAUDE PEPPER FED BLDG, MIAMI FL 33130 GSA BLDG #: FL0061ZZ
- Department of Transportation$24,044
BUILD BACK WORK AT THE POCATELLO, ID, ATCT CAUSED BY A RUPTURED SEWER LINE AT THE FACILITY
- Department of Transportation$2.14M
REPLACE AHUS AND RTUS AT ZAU ARTCC, AURORA, IL
- Department of the Interior$734,108
CHIC 327043 BRIDGE PRESERVATION
- Department of Transportation$1.14M
PONTIAC ATCT HVAC
- Department of the Interior$815,158
BITH 244484, PEDESTRIAN BRIDGE ABUTMENT REPAIRS-BIG THICKET NATIONAL PRESERVE
- General Services Administration$130,153
PROVIDE SIMPLE LAYOUT PLAN, AND INSTALL OF 12 SOLAR POWERED RADAR EQUIPPED SPEED LIMIT SIGNS. IRS SERVICE CENTER. 1160 W 12THJ ST., OGDEN, UT.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.