Federal contractor · public award history
PRICE CONTRACTING INC
Parent: PRICE CONTRACTING INC KXVHR7Z986H3
- Awards we know about
- 30
- Typical size
- $458,779
- Middle of their public awards
- Dollars on those awards
- $15.86M
Most of their awards we can see fall roughly between $246,269 and $780,151.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$3.22M
- 2025$12.64M
Awarding agencies
- Department of Agriculture (30)
Industries & product codes
Award history
- Department of Agriculture—
REGION 1 ROAD MAINTENANCE AND FOREST MAINTENANCE/SUPPORT SERVICES
- Department of Agriculture$3.59M
PERFORM ROADWAY RECONDITIONING ALONG PROJECT LENGTH (7 MILES OF RECONDITIONING FROM MP 21 TO MP 28 OF FSR 101). CRUSH, MIX, HAUL, AND PLACE SURFACE COURSE AGGREGATE ALONG PROJECT LENGTH (7 MILES OF SURFACING FROM MP 21 TO MP 28 OF FSR 101).
- Department of Agriculture$2.07M
ERFO RED LODGE AREA BRIDGE REPLACEMENTS & ROAD REPAIRS WPAP 675015
- Department of Agriculture$167,835
REPLACE MAAH DAAH HEY TRAIL BRIDGE AND MP 143 WHICH IS IN FAILURE MODE AND IS A CRITICAL PART OF THE NATIONALLY RECOGNIZED, POPULAR AND WORLD CLASS NON MOTORIZED TRAIL. THE EXISTING BRIDGE IS LOCATED APPROXIMATELY 1 MILE SOUTH OF THE RECENTLY RENOVAT
- Department of Agriculture—
BONNALIE LOGGING LLC IDNCF000495 E50
- Department of Agriculture$257,110
REPLACEMENT OF MORES CREEK BRIDGE. EXISTING BRIDGE HAS SIGNIFICANTLY DEGRADED AND IS BECOMING A PUBLIC SAFETY HAZARD.
- Department of Agriculture$835,975
0402 SIL CONST BOISE BRIDGE 236 REPLACEMENT
- Department of Agriculture$235,427
DISASTER SUPPLEMENT; DALY CREEK BRIDGE REPLACEMENT AND ROAD REPAIR
- Department of Agriculture$458,779
0412 CONST MOBILE ROCK CRUSHING, BASE
- Department of Agriculture$425,490
SPOTTED DOG & SLATE ROAD GRINDING
- Department of Agriculture$110,000
KERSEY LAKE ROAD FLOOD REPAIRS THAT INCLUDES ROAD RECONDITIONING AND A STREAM CROSSING
- Department of Agriculture$1.63M
TASK ORDER FOR FLTP COPPER CREEK ROAD IMPROVEMENTS ON THE LEWIS & CLARK NATIONAL FOREST
- Department of Agriculture$847,781
GAOA - GREEN BAY CAMPGROUND RENOVATIONS. THIS PROJECT CONSISTS OF CONSTRUCTING/RECONSTRUCTING VARIOUS CAMPING FACILITIES, ROADS, PATHS, AND PARKING AREAS AT THE GREEN BAY CAMPGROUND LOCATED ON THE IDAHO PANHANDLE NATIONAL FORESTS.
- Department of Agriculture$47,495
THE INTENT OF THIS PROJECT IS TO IMPROVE ROAD DRAINAGE AND RECONDITION NFSR 181 (BLOODY DICK ROAD) ON THE DILLON RANGER DISTRICT OF THE BEAVERHEAD DEERLODGE NATIONAL FOREST. THE WORK INCLUDES BUT IS NOT LIMITED TO; ROAD RECONDITIONING, PLACING BRUSH
- Department of Agriculture—
CIVIL CONSTRUCTION (ROAD&BRIDGE) IDIQ - INTERMOUNTAIN REGION FOR ZONE 2
- Department of Agriculture$623,905
ERFO CHICKEN CREEK BRIDGE & WEST ROSEBUD #2072 BRIDGE REPLACEMENTS & ROAD REPAIRS
- Department of Agriculture—
VIPR I-BPA FOR HEAVY EQUIPMENT WITH WATER FOR REGIONS 1,2,4, AND 9 (EAST ZONE)
- Department of Agriculture—
VIPR I-BPA FOR VIPR I-BPA FOR HEAVY EQUIPMENT TASK FORCE (HETF) FOR REGIONS 1 AND 4 ONLY
- Department of Agriculture$512,512
HLF GAOA TRD CROW CREEK ROAD IMPROVEMENTS
- Department of Agriculture—
USFS, REGION 4, ROAD AND BRIDGE CONSTRUCTION MATOC
- Department of Agriculture$464,512
THE GAOA FOREST LAKE ROAD RECONSTRUCTION PROJECT CONSISTS OF CONDUCTING ROAD RECONSTRUCTION TO FOREST ROAD NO. 66.
- Department of Agriculture$365,500
0413 CONST PINE CREEK #2 CRITICAL REHABILITATION - SCOUR REPAIR OF NFSR 60030 MP 19.7 BRIDGE INCLUDING CONCRETE CUTOFF WALL, RIPRAP, AND CUSTOM STREAM FEATURES.
- Department of Agriculture—
USFS, REGION 1, ROAD AND BRIDGE CONSTRUCTION MATOC
- Department of Agriculture$364,606
ST. JOE ROAD IMPROVEMENT TASK ORDER
- Department of Agriculture$390,135
GAOA - DEER CREEK BRIDGE REPLACEMENT LOLO NF
- Department of Agriculture$39,674
FERM BPA: BEARTOOTH RANGER DISTRICT ROAD MAINTENANCE TASK ORDER FY25
- Department of Agriculture$485,960
CONSTRUCTION OF 26' SPAN MULTI-PLATE PIPE ARCH SET ON PRECAST CONCRETE FOOTINGS. UTILIZE THE R4 CIVIL CONSTRUCTION MATOC, ZONE 1.
- Department of Agriculture$104,785
GAOA BLACK'S POND ACCESS ROADS (FOREST ROAD 4131 AND FOREST ROAD 4021) RECONSTRUCTION AND SITE REPAIRS 1BU: GAOA BLACKS POND RECREATION SITE TOILET DEFERRED MAINTENANCE IMPROVEMENT PROJECT
- Department of Agriculture$724,327
GAOA CENTENNIAL ROAD IMPROVEMENTS TASK ORDER ON THE MADISON RD
- Department of Agriculture$1.11M
HIGH PRIORITY - CLEAR ROADSIDE VEGETATION, RECONDITION, AND RESURFACE APPROXIMATELY 11 MILES OF NFS ROADS. UTILIZE EXISTING AGGREGATE STOCKPILES AT THE SAGE HEN PIT, APPROX. 32,000 TONS AVAILABLE. REPLACE DEFICIENT DRAINAGE CULVERTS WHERE NEEDED.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.