Y--Stegall Substation Stage 07
Energy, Department of · ENERGY, DEPARTMENT OF
- Response deadline
- Jul 23, 2026, 8:00 PM EDT
- Posted
- May 20, 2026
- Solicitation
- 89503226BWA000075
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- WESTERN-ROCKY MOUNTAIN REGION · LOVELAND · CO
- Source
- SAM.gov · updated May 21, 2026
Description
NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted. The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The Stegall Substation Stage 07 Phase 01 Construction Project enhances WAPA�s ability to provide reliable/cost-efficient electrical power by replacing end-of-life control building, disconnect switches, and oil circuit breakers. New gas circuit breakers are on site and ready for installation by the contractor. WAPA benefits from these replacements by resolving deteriorating and potentially dangerous equipment conditions while setting up the substation for future Phase 02 conversion to breaker and a half bus configuration. The principal components of work include the following: Replace 115kV circuit breakers, 230 and 115kV disconnect switches, re-conductor 230 and 115kV main bus, construct new control building and comm tower Location: Stegall Substation Situated near Stegall Road in the unincorporated community of Stegall, NE, just north of the Colorado-Nebraska border. Directions: From Gering head south on 10th Street (Kimball Avenue) from M Street for 1.8 miles to Robidoux Road. Turn right and go 4 miles to County Road 17. Turn right and go 0.1 miles to Robidoux Road. Turn left and go 3.3 miles on Robidoux Road, turn right and continue 5 miles on Robadeuax Road to Stegall Road. Turn right and go 0.8 miles to substation on the right. Latitude: N 41� 49' 10" Longitude: W 103� 56' 37" Elevation: 4256 ' Datum: NAD83/WGS84 The anticipated period of performance is 800 calendar days after Notice to Proceed. The estimated magnitude of construction is Between $5M and $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 9 June 2026 at the following sites: https://www.fedconnect.net and https://www.sam.gov. NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material. Please see the link for Construction Change Order Definitization Notices - https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$892,581
Middle of the pack for similar past awards
Most similar awards fall between $599,307 and $2.34M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1ADDISON CONSTRUCTION CO4 awards$3.51M
- 2MOSARK LLC1 award$2.19M
- 3ALTITUDE ENERGY LLC1 award$892,581
- 4FLAKE TOWERS, LLC1 award$702,426
- 5NATIONAL CONDUCTOR, INC.1 award$293,196
- 6COMPLETE CONCRETE, INC.2 awards$285,356
- 7L.J.V. DEVELOPMENT, LLC1 award$264,018
- 8HIGHMARK ERECTORS, INC1 award$252,873
Recent examples
A few of the newest similar awards in our index.
- L.J.V. DEVELOPMENT, LLCSep 25, 2025Department of the Interior$264,018Source
- COMPLETE CONCRETE, INC.Sep 24, 2025Department of Energy$237,414Source
- COMPLETE CONCRETE, INC.Sep 24, 2025Department of Energy$47,942Source
- ADDISON CONSTRUCTION COSep 23, 2025Department of Energy$933,228Source
- NATIONAL CONDUCTOR, INC.Sep 17, 2025Department of Energy$1.79MSource
- ADDISON CONSTRUCTION COSep 10, 2025Department of Energy$2.34MSource
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 04a8e11c9afc4a048a9e4288c0ed578c.