Chancery 3003 Integrated window blinds (104)
State, Department of · STATE, DEPARTMENT OF
Opportunity details
Chancery 3003 Integrated window blinds (104) is currently listed as accepting responses on SAM.gov. Buyer context: State, Department of · STATE, DEPARTMENT OF. Industry classification: Other Building Finishing Contractors (NAICS 238390). Product/service classification: INSTALLATION OF EQUIPMENT- MISCELLANEOUS (PSC N099). Set-aside: No Set aside used. Performance location: Bern, CH-BE, CHE. Notice type: Special Notice. GovGazette adds public award history and related pages to help you decide whether to keep reading. Check all requirements on SAM.gov.
- Check the NAICS and PSC codes, set-aside rules, place of performance, and time left before the deadline.
- This notice lists a set-aside (No Set aside used). Confirm your certification and size status under the official SBA and agency rules before you spend time on a proposal.
- This page uses 574 related public awards. The range describes past awards; it does not set a bid price.
- Use the NAICS and PSC pages to find other open notices under the same codes.
- Response deadline
- Aug 5, 2026, 10:00 AM EDT
- Set-aside
- No Set aside used
- Place of performance
- Bern, CH-BE, CHE
- Posted
- Jul 14, 2026
- Solicitation
- PR16077115
- Contracting office
- U.S. EMBASSY BERN · WASHINGTON · DC
- Source
- SAM.gov
Description
Statement of Work (SOW): Maintenance & Motor Retrofit (Final Version) Project: Refurbishment of 104 Integrated Venetian Blinds Location: Office Building � Bern, Switzerland System Type: Warema Type 1.16/25/35.07 (24v motor) inside WICONA WICLINE Aluminum Composite Windows 1. Project Objective The contractor shall provide a turnkey solution for the inspection, repair, and motor retrofit of 104 integrated venetian blinds. The objective is to restore 100% motorized functionality while maintaining the thermal, acoustic, and aesthetic integrity of the WICONA window units. 2. Comprehensive Pricing & Scope The offer submitted by the contractor must be all-inclusive. No additional costs will be entertained after the contract award. The bid price shall include: Labor: All technician, electrician, and logistical personnel hours. Materials: All motors, cables, lift tapes, ladder cords, and hardware components. Equipment: All tools, specialized window opening devices, safety gear, and cleaning supplies. Transportation: All travel costs, vehicle expenses, and shipping/freight for parts. Fees: Disposal fees, administrative costs, and any required permits or insurance. 3. Logistics & Site Management Furniture Management: Contractor shall move office furniture and equipment as required to gain unobstructed access to the windows. All items must be protected and returned to their original positions upon completion. Surface Protection: Provide appropriate floor and wall protection during the transit of tools and components. 4. Health, Safety & Electrical Standards Qualified Personnel: Only certified electricians (per Swiss regulations) may perform electrical work. Lockout/Tagout (LOTO): A strict LOTO procedure must be implemented. Hazardous energy sources must be isolated, locked, and tagged before work commences. Verification: Zero-energy state must be verified via testing before physical contact with wiring. Controls: Each motor control shall be integrated into the Building KNX system. 5. Technical Execution: WICONA & Warema Systems Sash Access: Open the internal "sandwich" sash of the WICONA windows using the integrated latches. Hardware Maintenance: Inspect and lubricate all WICONA latching mechanisms and concealed hardware. Gasket Inspection: Verify the condition of internal gaskets. Damaged seals must be reported or replaced to ensure the cavity remains dust and moisture-free. Blind Retrofit: Identify and replace failed motors with compatible high-quality alternatives (e.g., Somfy, Elero) that fit the existing Warema headrails. Replace worn lift tapes and ladder cords as necessary to ensure smooth mechanical operation. 6. Commissioning & Integration Calibration: Set electronic end-limits (upper/lower) for every unit. Testing: Perform three full cycles (Up/Down/Tilt) per window to ensure defect-free operation. System Integration: Ensure new motors are integrated into the existing building control or radio systems. 7. Waste Disposal (Swiss Compliance) Swiss Codes: Disposal must comply with vREG/ORDEA (Electrical Waste) and VeVA/OMW (Waste Movements). Recycling: Deliver old motors and aluminum scrap to authorized SENS eRecycling or Swico collection points. Evidence: Contractor shall provide official disposal certificates (Entsorgungsnachweis). 8. Cleaning & Handover Internal Cleaning: Clean internal glass surfaces and aluminum slats before closing the sash. Final Report: Provide a list of all units serviced, including specific motor model numbers used.
What similar awards have paid
See what agencies paid for similar work. This public history does not set a bid price, estimate a cost, or predict an award.
Typical award size
$28,824
Middle of the pack for similar past awards
Most similar awards fall between $14,996 and $93,119
Who has won work like this
These firms won similar public awards. Use the list for competitor research or teaming, not as a ranking.
- 1KRUEGER INTERNATIONAL, INC.258 awards$22.18M
- 2FLATWATER PROFESSIONAL SERVICES COMPANY57 awards$21.22M
- 3WICHITA FALLS TRI-TECH, LLC3 awards$8.38M
- 4BPD ENGINEERING, LLC102 awards$7.34M
- 5INDUSTRIES FOR THE BLIND AND VISUALLY IMPAIRED, INC.10 awards$4.16M
- 6TERRA SITE CONSTRUCTORS LLC1 award$2.97M
- 7HAMILTON PACIFIC CHAMBERLAIN LLC1 award$1.63M
- 8VF SERVICES LLC3 awards$1.54M
Drawn from official USAspending contract records. Always confirm requirements on the SAM.gov notice before you bid.
For research only. This is not legal advice or a promise of an award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Open the original SAM.gov notice for the official record.