Carbon Filter Pellet Removal and Replacement
Dept of Defense · DEPT OF THE AIR FORCE
Opportunity details
Carbon Filter Pellet Removal and Replacement is currently listed as accepting responses on SAM.gov. Buyer context: Dept of Defense · DEPT OF THE AIR FORCE. Industry classification: Carbon and Graphite Product Manufacturing (NAICS 335991). Product/service classification: DECONTAMINATING AND IMPREGNATING EQUIPMENT (PSC 4230). Set-aside: No Set aside used. Performance location: JBER, AK, USA. Notice type: Solicitation. GovGazette adds public award history and related pages to help you decide whether to keep reading. Check all requirements on SAM.gov.
- Check the NAICS and PSC codes, set-aside rules, place of performance, and time left before the deadline.
- This notice lists a set-aside (No Set aside used). Confirm your certification and size status under the official SBA and agency rules before you spend time on a proposal.
- This page uses 5 related public awards. The range describes past awards; it does not set a bid price.
- Use the NAICS and PSC pages to find other open notices under the same codes.
- Response deadline
- Aug 4, 2026, 8:00 PM EDT
- Set-aside
- No Set aside used
- Place of performance
- JBER, AK, USA
- Posted
- Jul 17, 2026
- Solicitation
- FA500026Q0037
- Contracting office
- FA5000 673 CONS LGC · JBER · AK
- Source
- SAM.gov
Description
The 3rd Maintenance Squadron (3rd MXS) Fabrication Flight, located at Joint Base Elmendorf-Richardson (JBER), AK, requires professional carbon filter media with installation and disposal of spent carbon for air filtration systems in Building 6263 and Building 9696. � The Corrosion Facility (Bldg. 6263) operates three paint booths requiring a total of 440 filters. This setup includes two small paint booths that need enough carbon pellets to fill 160 filters total (80 per booth). The filters for these small booths measure 20" L x 3" W x 20" H. Additionally, the facility houses one large paint booth that requires carbon pellets to fill 280 filters, which measure 24" L x 3" W x 24" H. � The ASMLO Facility (Bldg. 9696) consists of four aircraft bays requiring a total of 792 filters. All filters utilized in the ASMLO facility are identically sized. Each of the four bays requires 198 large filters, all measuring 24" L x 3" W x 24" H. Requirement: 1. Carbon Media delivery and installation of 34,000 lbs of 4mm particle carbon pellets. 2. Removal and disposal of spent carbon in accordance with all local, state and federal regulations. 3. Installation of new carbon must strictly adhere to the Original Equipment Manufacturer (OEM) instructions. 4. Contractor is responsible for furnishing all equipment and specialized tools required to complete the maintenance. 5. The contractor shall provide all labor, materials, equipment, and tools necessary to perform a bulk carbon filter exchange.
What similar awards have paid
See what agencies paid for similar work. This public history does not set a bid price, estimate a cost, or predict an award.
Typical award size
$16,681
Middle of the pack for similar past awards
Most similar awards fall between $12,000 and $19,948
Who has won work like this
These firms won similar public awards. Use the list for competitor research or teaming, not as a ranking.
- 1A & P TECHNOLOGY, INC.1 award$20,000
- 2HELWIG CARBON PRODUCTS INC1 award$19,948
- 3CAMFIL USA INC1 award$16,681
- 4CARBON CARBON ADVANCED TECHNOLOGIES, INC.1 award$12,000
- 5RED ORANGE NORTH AMERICA1 award$11,925
Drawn from official USAspending contract records. Always confirm requirements on the SAM.gov notice before you bid.
For research only. This is not legal advice or a promise of an award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Open the original SAM.gov notice for the official record.