ClosedPresolicitation
Veterans Affairs, Department of contract category

Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC

Veterans Affairs, Department of · VETERANS AFFAIRS, DEPARTMENT OF

This notice is not accepting responses.

Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.

Response deadline
Not listed
Posted
Jun 25, 2026
Solicitation
36C77626B0026
Set-aside
SDVOSB
Place of performance
Gainesville, FL, USA
Contracting office
PCAC (36C776) · INDEPENDENCE · OH
Source
SAM.gov · updated Jun 26, 2026

Description

INTRODUCTION The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build EHRM Infrastructure Upgrades and Data Center Construction project at the Gainesville VA Medical Center located at 1601 Southwest Archer Road, Gainesville, FL 32608. PROJECT DESCRIPTION The scope of this project is to replace all data infrastructure across the Gainesville VAMC and to build a new data center to support that upgraded system. The data center building will be one story, and the footprint will be approximately 3,931 SF at the location of temporary trailer 11, which will be demolished as part of this project. The primary space within the building is the 1,177 SF Data Center Room. Supporting spaces include Unpacking/Packing/Staging, Entrance Room, and Storage. Mechanical, Electrical, and HVAC spaces. Additionally, a new generator will be housed in a separate Generator Room. Also, this project will be removing all existing equipment and cabling affiliated with the telecom rooms in all campus buildings. There are 59 telecom rooms that may require architectural work. Some rooms are existing TRs being reused, but most are new rooms being redesigned for the telecom equipment. In rare cases telecom enclosures are recommended and/or exceptions will be required. The entire campus will be occupied while work occurs. Contractor will have to coordinate room closures and shutdowns with the COR. Most rooms on campus will be affected. Some off-hour work is anticipated for more critical spaces. ADMINISTRATIVE The solicitation will be issued as an Invitation for Bids (IFB) conducted in accordance with FAR part 14 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45.0 million. The solicitation will be issued in mid to late July 2026, with an estimated late September 2026 award. The period of performance is approximately 921 calendar days from the issuance of the notice to proceed. In accordance with VAAR 836.204, the magnitude of construction is between $20,000,000 and $50,000,000 (although the middle of this range is more relevant). This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to Shawn.Tavernia@va.gov. Telephone calls will not be accepted.

What similar awards have paid

Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.

Typical award size

$3.28M

Middle of the pack for similar past awards

Most similar awards fall between $788,916 and $10.49M

Lower end$788,916Typical$3.28MHigher end$10.49M
Based on 443 similar awardsSame industry code (236220)Same product/service code (Y1DA)Prime contracts (not umbrella IDVs)

Who has won work like this

Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.

Recent examples

A few of the newest similar awards in our index.

Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.

Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 90f488f13c5c4601b88f6f7b2fd80fb8.