Kimball Creek Culvert Replacement FR-304
Agriculture, Department of · FOREST SERVICE
This notice is not accepting responses (deadline was Feb 4, 2026, 2:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Feb 4, 2026, 2:00 PM EST
- Posted
- Jan 21, 2026
- Solicitation
- 12445526R0001
- Set-aside
- None listed
- Place of performance
- Grand Marais, MN, USA
- Contracting office
- USDA FOREST SERVICE · ATLANTA · GA
- Source
- SAM.gov · updated Jul 5, 2026
Description
The purpose of this update is to add additional attachments for the below: Sheet R07 and R08 (aka bridge plan sheet 7 and 8 of 10) were missing the dimensions for the reinforcing steel. Second, there is a change to sheet S02 �Temporary Diversion Channels�. There was a question regarding Note 1 on Temporary Diversion Channel drawing S-02. Note 1 has been revised to explain that the temporary diversion details provided are proposed details and the contractor is responsible for the design of the diversion channel/culvert. A table of peak flows has also been added to drawing S-02 to assist in the diversion design. Updated to change attachment. The U.S. Department of Agriculture, Forest Service announces an opportunity on the Superior National Forest for the following: The Superior National Forests has a need for the replacement of the Kimball Creek Culvert on low volume Forest Road 304; traffic control monitoring, demolition and removal existing culvert and creek debris, dewatering, furnish and install new structural plate arch (corrugated aluminum, alternate-corrugated galvanized steel) including all components and installation hardware; furnish and install rip rap, installation of headwall and wing walls; furnish and place aggregate to final road grade; regrading structural plate arch approaches; install permanent traffic signs; seed and mulch all disturbed areas; and protect Kimball Creek and associated wetlands from siltation and other destructive impacts of construction. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies necessary to meet the intent of this contract; and shall perform all work in close conformity with the drawings and specifications, and in accordance with the provisions of the contract. The CO must approve any deviation in the specifications or drawings. Estimated Period of Performance: 30 days between June 30th and September 15th, 2026. The Davis-Bacon and Related Acts (DBRA) apply to this solicitation. See attachments for complete details and bid submission instructions. There is no site visit scheduled. Interested bidders can visit on their schedule. Please contact Peter Lindgren if you have site questions at peter.lindgren@usda.gov or 218-387-3253. This announcement constitutes a solicitation for construction issued as a Request for Proposal (RFP) in accordance with FAR Part 12. Interested contractors must be active in SAM.gov on the date the bid is received to be eligible for award. Quotes submitted by contractors without an active record in SAM.gov will not be considered. The solicitation is posted to SAM.gov and no hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. No reimbursement will be made for any costs associated with providing information in response to this solicitation or any follow-up information requests. For further information, review the attached RFP solicitation and associated attachments. All questions shall be submitted by 1/21/2026.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$233,069
Middle of the pack for similar past awards
Most similar awards fall between $73,320 and $719,048
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1WILLIAMS CONSTRUCTION & CABINETRY, INC.7 awards$21.23M
- 2MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC3 awards$19.19M
- 3CENTRAL ENVIRONMENTAL INC1 award$9.89M
- 4O-K GRAVEL WORKS LLC1 award$7.74M
- 5PRICE CONTRACTING INC6 awards$6.84M
- 6YERBA BUENA ENGINEERING & CONSTRUCTION, INC.1 award$5.89M
- 7ADAMS CONTRACTING CO1 award$5.68M
- 8BLUE TRIDENT, LLC1 award$5.56M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID b5a3c88a7b2c4316b788553d64fe7e8b.