OpenSolicitation71 days left

HH-60W Degraded Visual Environment System(DVES) - FA8552-26-R-B001

Dept of Defense · DEPT OF THE AIR FORCE

Opportunity details

HH-60W Degraded Visual Environment System(DVES) - FA8552-26-R-B001 is currently listed as accepting responses on SAM.gov. Buyer context: Dept of Defense · DEPT OF THE AIR FORCE. Industry classification: Aircraft Manufacturing (NAICS 336411). Product/service classification: MODIFICATION OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS (PSC K015). Set-aside: No Set aside used. Performance location: USA. Notice type: Solicitation. GovGazette adds public award history and related pages to help you decide whether to keep reading. Check all requirements on SAM.gov.

  • Check the NAICS and PSC codes, set-aside rules, place of performance, and time left before the deadline.
  • This notice lists a set-aside (No Set aside used). Confirm your certification and size status under the official SBA and agency rules before you spend time on a proposal.
  • This page uses 372 related public awards. The range describes past awards; it does not set a bid price.
  • Use the NAICS and PSC pages to find other open notices under the same codes.
Response deadline
Oct 8, 2026, 4:00 PM EDT
Set-aside
No Set aside used
Place of performance
USA
Posted
Jul 17, 2026
Solicitation
FA8552-26-R-B001
Contracting office
FA8552 AFLCMC WIU · ROBINS AFB · GA
Source
SAM.gov

Description

Description of Anticipated Requirement: The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential period of performance of eight (8) years. RFP Amendment 01 removed Attachment 3 Past Performance Information for Offerors and updated Attachment 14 Section L to remove references to Attachment 3 Past Performance Information for Offerors

What similar awards have paid

See what agencies paid for similar work. This public history does not set a bid price, estimate a cost, or predict an award.

Typical award size

$95,630

Middle of the pack for similar past awards

Most similar awards fall between $27,717 and $745,287

Lower end$27,717Typical$95,630Higher end$745,287
Based on 372 similar awardsAircraft Manufacturing336411Prime contracts, excluding umbrella award vehicles

Who has won work like this

These firms won similar public awards. Use the list for competitor research or teaming, not as a ranking.

Drawn from official USAspending contract records. Always confirm requirements on the SAM.gov notice before you bid.

For research only. This is not legal advice or a promise of an award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Open the original SAM.gov notice for the official record.

Related open government contracts

More in Aircraft Manufacturing →
Federal vendorsMore from Dept of DefenseAircraft Manufacturing336411MODIFICATION OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTSK015