Y--Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and Quinn Creek Substation
Energy, Department of · ENERGY, DEPARTMENT OF
This notice is not accepting responses (deadline was Jul 2, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jul 2, 2026, 8:00 PM EDT
- Posted
- Apr 27, 2026
- Solicitation
- 89503226BWA000073
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- WESTERN-ROCKY MOUNTAIN REGION · LOVELAND · CO
- Source
- SAM.gov · updated May 9, 2026
Description
NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted. The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and new Quinn Creek Substation projects aim to enhance WAPA�s ability to provide reliable and cost-efficient electric power, aligning with WAPA�s mission. WAPA benefits from the transmission line upgrades by resolving deteriorating conditions on the existing Glendo � Lusk Rural Tap 69kV line. The principal components of work include the following: Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) is proposing to upgrade 35 miles of its Lusk Rural Tap-Glendo (LRT- GLD) 69-kV transmission line to a 115-kV transmission line (Upgrade) in Platte and Niobrara counties, Wyoming and construct a new substation located in Niobrara County, Wyoming. The Upgrade starts at the Glendo Substation (GLD) and runs generally northeast for approximately 25 miles (25.4 miles). A new substation and delivery point named Quinn Creek Substation (QCK) will be constructed in this location. From the QCK Substation, the Upgrade will continue in a northeast direction for approximately 3 miles, it would then run east for approximately 6 miles and terminate at WAPA�s Lusk Rural Tap (LRT) just west of the town of Lusk. The Upgrade consists of replacing the LRT-GLD line with a new 115-kV wood pole H-frame transmission line. The new Quinn Creek Substation (QCK), with a 69-kV delivery point, will be constructed on about 5 acres on open rangeland. The Upgrade will be sectionalized into a 25.4-mile-long section called Casper (Pace)-Quinn Creek (CPL-QCK), a 9.4-mile-long Quinn Creek-Lusk Rural Tap (QCK-LRT) will be constructed to 115-kV specifications but operated at 69-kV for the near term. The Upgrade will be constructed on existing ROW, widened by 20 to 25 feet to provide proper clearance for the higher voltage, lengthened spans, and potentially greater blow-out. Location: Platte and Niobrara, 82213, 82227, 82225 Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213 Lusk Rural Tap (LRT) - Latitude: N 42� 46' 0"; Longitude: W 104� 28' 52"; Datum: NAD83/WGS84 Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo Substation The anticipated period of performance is 800 days calendar days after Notice to Proceed or by December 2028. The estimated magnitude of construction is greater than $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 1 June 2026 at the following sites: https://www.fedconnect.net and https://www.sam.gov. NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material. Please see the link for Construction Change Order Definitization Notices - https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$892,581
Middle of the pack for similar past awards
Most similar awards fall between $599,307 and $2.34M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1ADDISON CONSTRUCTION CO4 awards$3.51M
- 2MOSARK LLC1 award$2.19M
- 3ALTITUDE ENERGY LLC1 award$892,581
- 4FLAKE TOWERS, LLC1 award$702,426
- 5NATIONAL CONDUCTOR, INC.1 award$293,196
- 6COMPLETE CONCRETE, INC.2 awards$285,356
- 7L.J.V. DEVELOPMENT, LLC1 award$264,018
- 8HIGHMARK ERECTORS, INC1 award$252,873
Recent examples
A few of the newest similar awards in our index.
- L.J.V. DEVELOPMENT, LLCSep 25, 2025Department of the Interior$264,018Source
- COMPLETE CONCRETE, INC.Sep 24, 2025Department of Energy$237,414Source
- COMPLETE CONCRETE, INC.Sep 24, 2025Department of Energy$47,942Source
- ADDISON CONSTRUCTION COSep 23, 2025Department of Energy$933,228Source
- NATIONAL CONDUCTOR, INC.Sep 17, 2025Department of Energy$1.79MSource
- ADDISON CONSTRUCTION COSep 10, 2025Department of Energy$2.34MSource