Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Springs
Veterans Affairs, Department of · VETERANS AFFAIRS, DEPARTMENT OF
This notice is not accepting responses (deadline was Dec 18, 2025, 2:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Dec 18, 2025, 2:00 PM EST
- Posted
- Oct 14, 2025
- Solicitation
- 36C77626B0001
- Set-aside
- SDVOSB
- Place of performance
- Big Springs, TX, USA
- Contracting office
- PCAC (36C776) · INDEPENDENCE · OH
- Source
- SAM.gov · updated Jul 5, 2026
Description
INTRODUCTION The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build EHRM Infrastructure Upgrades Tier 2 Data Center construction project at the West Texas VA Health Care System located at 300 Veterans Boulevard, Big Springs, TX 79720. PROJECT DESCRIPTION The West Texas VA Health Care System is seeking a general contractor to furnish all labor, materials, equipment, and supervision, and perform all work necessary to prepare site for building operations and complete the EHRM Infrastructure Upgrades Tier 2 Data Center construction project. This project will take vacated space and renovate it to meet all current EHRM criteria. All work is to be performed in accordance with the drawings and specifications. ADMINISTRATIVE The solicitation will be issued as an Invitation for Bids (IFB) conducted in accordance with FAR part 14 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45.0 million. The solicitation will be issued in mid-November 2025. The period of performance is approximately 224 calendar days from the issuance of the notice to proceed. In accordance with VAAR 836.204, the magnitude of construction is between $5,000,000 and $10,000,000. This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to devin.russell@va.gov. Telephone calls will not be accepted.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$526,498
Middle of the pack for similar past awards
Most similar awards fall between $128,382 and $3.46M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1ESA SOUTH, INC.4 awards$78.87M
- 2BRISTON CONSTRUCTION, LLC6 awards$72.23M
- 3HURLEY JV, LLP6 awards$66.49M
- 4ONSITE CONSTRUCTION GROUP LLC26 awards$60.84M
- 5TALION CONSTRUCTION, LLC4 awards$53.51M
- 6BLUE CORD DESIGN AND CONSTRUCTION, LLC7 awards$51.30M
- 7IRONCLAD SERVICES INC5 awards$49.81M
- 8GUARANTEE INTERIORS, INC.41 awards$49.29M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID d8c14b212b084134b878ec416f01c404.