Request for Proposals - Central Utility Building Purge Unit Replacement for Chiller No. 5 Fermi National Accelerator Laboratory, Batavia, Illinois
Energy, Department of · ENERGY, DEPARTMENT OF
This notice is not accepting responses (deadline was Jun 11, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jun 11, 2026, 8:00 PM EDT
- Posted
- Jun 10, 2026
- Solicitation
- RFP380663CJ
- Set-aside
- No Set aside used
- Place of performance
- Batavia, IL, USA
- Contracting office
- FERMILAB - DOE CONTRACTOR · Batavia · IL
- Source
- SAM.gov · updated Jun 11, 2026
Description
************************** AMENDMENT 03 Changes were made to the Request for Proposal and Proposal due date revised to June 19, 2026 at 12:00 p.m. CT. Please see Amendment 03 and uploads. Offerors are required to acknowledge receipt of all amendments. Acknowledgment of amendments must be provided by sending written confirmation via email to the Procurement Specialist upon receipt of the amendment. Failure to acknowledge amendments may result in the rejection of an Offeror�s proposal. ************************** AMENDMENT 02 Changes were made to the Request for Proposal. Please see Amendment 02 and uploads. Offerors are required to acknowledge receipt of all amendments. Acknowledgment of amendments must be provided by sending written confirmation via email to the Procurement Specialist upon receipt of the amendment. Failure to acknowledge amendments may result in the rejection of an Offeror�s proposal. ************************** AMENDMENT 01 Overview - Proposal due date revised to June 12, 2026. Amendment 01 uploaded. Offerors are required to acknowledge receipt of all amendments. Acknowledgment of amendments must be provided by sending written confirmation via email to the Procurement Specialist upon receipt of the amendment. Failure to acknowledge amendments may result in the rejection of an Offeror�s proposal. ************************** The Offerors shall provide services to remove, replace, test and return Chiller No. 5 to operational condition at the Central Utility Building (CUB) on Fermi National Accelerator Laboratory (Fermilab) campus, in Batavia, Illinois. The Offerors shall furnish all labor, supervision, materials, tools, equipment, transportation and items required to perform these services.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$55,318
Middle of the pack for similar past awards
Most similar awards fall between $20,933 and $167,121
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1RJY GROUP LLC13 awards$7.89M
- 2VET FIRST CONSTRUCTORS, LLC1 award$7.14M
- 3MULTI AIR SERVICES ENGINEERS, CORP2 awards$6.38M
- 4JOHNSON CONTROLS INC3 awards$5.30M
- 5CHEROKEE NATION ENVIRONMENTAL SOLUTIONS, L.L.C.1 award$5.20M
- 6REON INC5 awards$4.66M
- 7J&B HARTIGAN, INC.5 awards$4.44M
- 8BROTHERS MECHANICAL SERVICES LLC4 awards$4.33M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID de7053975ee345529f9543ed81344172.