Y--Cottonwood Substation Construction, Stage 02, Phase 01
Energy, Department of · ENERGY, DEPARTMENT OF
This notice is not accepting responses (deadline was Jun 28, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jun 28, 2026, 8:00 PM EDT
- Posted
- May 11, 2026
- Solicitation
- 89503326BWA000019
- Set-aside
- Total Small Business
- Place of performance
- —
- Contracting office
- WESTERN-SIERRA NEVADA REGION · FOLSOM · CA
- Source
- SAM.gov · updated May 13, 2026
Description
Cottonwood Substation Construction, Stage 02, Phase 01 Western Area Power Administration, Sierra Nevada Region has a requirement for a contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of Cottonwood Substation, Stage 02, Phase 01 located in Shasta County, CA. The principal components of work include one (1) pre-fabricated control building foundation, site development for yard access, removal of existing wall to accommodate one (1) automatic 20-foot rolling gate, gate accessibility equipment including one (1) environmental enclosure and associated control cables, two (2) keypads and one (1) gate motor operator, station service arrangement and associated foundations including one (1) AC distribution panel, one (1) automatic transfer switch and two (2) fusible safety disconnect switches, two (2) precast pull boxes, and concrete encased duct banks. The estimated construction magnitude of this project is between $500,000 and $1,000,000. All work is to be completed within 180 days from receipt of Notice to Proceed. The solicitation will be issued as a 100% Small Business Set-aside. The applicable NAICS Code is 237130 with an SBA Size Standard of $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 29 May 2026 to the following sites: https://www.fedconnect.net and https://www.sam.gov. This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Emailed bids WILL NOT be accepted. Note: The Buy American Act applies to the solicitation. Refer to RFO FAR Clause 52.225-9 and RFO FAR Provision 52.225-10 if any non-domestic material is proposed. Bidders must identify any non-domestic materials included in their bid. Please verify with suppliers and subcontractors whether their quotes will include non-domestic material.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$892,581
Middle of the pack for similar past awards
Most similar awards fall between $599,307 and $2.34M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1ADDISON CONSTRUCTION CO4 awards$3.51M
- 2MOSARK LLC1 award$2.19M
- 3ALTITUDE ENERGY LLC1 award$892,581
- 4FLAKE TOWERS, LLC1 award$702,426
- 5NATIONAL CONDUCTOR, INC.1 award$293,196
- 6COMPLETE CONCRETE, INC.2 awards$285,356
- 7L.J.V. DEVELOPMENT, LLC1 award$264,018
- 8HIGHMARK ERECTORS, INC1 award$252,873
Recent examples
A few of the newest similar awards in our index.
- L.J.V. DEVELOPMENT, LLCSep 25, 2025Department of the Interior$264,018Source
- COMPLETE CONCRETE, INC.Sep 24, 2025Department of Energy$237,414Source
- COMPLETE CONCRETE, INC.Sep 24, 2025Department of Energy$47,942Source
- ADDISON CONSTRUCTION COSep 23, 2025Department of Energy$933,228Source
- NATIONAL CONDUCTOR, INC.Sep 17, 2025Department of Energy$1.79MSource
- ADDISON CONSTRUCTION COSep 10, 2025Department of Energy$2.34MSource
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID ea605c0eb13642b78ad12f10583f9cbd.