Ogden-Hinckley Airport (OGD) Air Traffic Control Tower (ATCT) Design-Build
Transportation, Department of · FEDERAL AVIATION ADMINISTRATION
This notice is not accepting responses (deadline was Nov 14, 2025, 5:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Nov 14, 2025, 5:00 PM EST
- Posted
- Nov 6, 2025
- Solicitation
- 697DCK-25-R-00437
- Set-aside
- None listed
- Place of performance
- Ogden, UT, USA
- Contracting office
- 697DCK REGIONAL ACQUISITIONS SVCS · FORT WORTH · TX
- Source
- SAM.gov · updated Jul 5, 2026
Description
*Amendment 3 to solicitation 697DCK-25-R-00437 was issued on November 6, 2025. The purpose of amendment 3 is to incorporate questions and answers 3. All other terms and conditions remain unchanged. See Amendment 3 for all changes ------------------------------------------------------------------------------------------------------------------------------- *Amendment 2 to solicitation 697DCK-25-R-00437 was issued on November 3, 2025. The purpose of amendment 2 is to extend the proposal due date to November 14, 2025 no later than 1700 ET. This amendment will also incorporate questions and answers 2. All other terms and conditions remain unchanged. See Amendment 2 for all changes --------------------------------------------------------------------------------------------------------------------------------- *Amendment 1 to solicitation 697DCK-25-R-00437 was issued on October 17, 2025. The purpose of amendment 1 is to update past performance criteria, incorporate questions and answers, and add attachment 1 and attachment 13 to section J. All other terms and conditions remain unchanged. See Amendment 1 for all changes. -------------------------------------------------------------------------------------------------------------------------------- ***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$1.45M
Middle of the pack for similar past awards
Most similar awards fall between $237,819 and $37.20M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1WALSH CONSTRUCTION COMPANY II, LLC1 award$86.45M
- 2WALSH FEDERAL LLC3 awards$78.58M
- 3STRUCTSURE PROJECTS INC1 award$63.87M
- 4E CORP1 award$10.52M
- 5PREFERRED ELECTRIC, LLC1 award$4.17M
- 6BP CONSTRUCTION JV LLC1 award$1.45M
- 7CMGC BUILDING CORP1 award$790,413
- 8LI CRAFTSMANSHIP INC1 award$325,638
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID f4264ca417854b169b35d3da5a5b4624.