Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Aug 7, 2025, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Aug 7, 2025, 8:00 PM EDT
- Posted
- Aug 7, 2025
- Solicitation
- W912PL25BA007
- Set-aside
- Total Small Business
- Place of performance
- —
- Contracting office
- W075 ENDIST LOS ANGELES · LOS ANGELES · CA
- Source
- SAM.gov · updated May 9, 2026
Description
PIEE Update 0007 is issued to transmit the Pre-Bid Site Visit #2 sign-in sheet (3 pages) for the IFB W912PL25BA007. PIEE Update 0006 is to transmit the SF-30 (3 pages) for Amendment 0004 of the IFB W912PL25BA007. This is to replace plan sheet 5A-M-002 and to provide site visit #2 information. Amendment 0004 does not extend the bid opening date. PIEE update 0005 is to transmit the SF-30 (7 pages) for Amendment 0003 of the IFB W912PL25BA007. This is to extend the bid open date, revise section 00 21 00 Instructions, revise section 00 21 13 Instructions to Bidders, and attach Documents 1-7 to address RFI inquiries. PIEE update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. This is to inform the public of upcoming Amendment 0003 that will include the revised Plan Set and remove all references of bid submission through DoD Safe. Bids may only be submitted through PIEE. PIEE Update 0003 is issued to transmit the SF30 (2 pages) for Amendment 0002 of the IFB W912PL25BA007 to extend the bid opening date. PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA007. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA007, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. Provide all material and labor required to upgrade central chiller plant and DDC controls in Building 5A of the Long Beach VA campus, to comply with the latest codes and VA standards. All construction shall be performed in accordance with drawings and specifications provided by the VA. This project intends to replace the existing chillers, upgrade/refurbish existing cooling towers, upgrade/replace the primary and secondary chilled water pumps, condenser water pumps, related piping and controls, pressure differential Delta P valves in main chilled water lines entering each of the buildings and interface with existing Johnson Controls Metasys System. SOW includes but is not limited to:1. Civil-Site demolition includes removing existing concrete mow curb, cobbles and concrete pavement, gravel ground cover, irrigation, and sod.-New concrete sidewalk-One existing manhole will need to be raised to the new finished grade. A new pre-cast concrete manhole ring will be provided and installed by the contractor2. Structural-One of the new chillers shall be supported on the existing concrete pad, and for the other a new concrete foundation shall be provided. The chillers are connected to the concrete pad expansion anchors. The new air separator tank and expansion tank are supported and anchored to a new concrete pad. Equipment pumps are supported and anchored to concrete pads.-Electrical equipment shall be supported and anchored on new concrete pads mounted on the existing slab on grade-New piping is hung from the existing roof structure and supported on steel pipe supports as required3. Cooling Towers and Condenser Water Piping-Each of the existing four cell cooling towers (1100 ton per cell) shall be refurbished, including thermal upgrade to improve their performance-Install one new, factory built, packaged cooling tower with water filtration system and sweeper piping, condenser water pump, new piping and piping accessories-For existing 4-cell cooling towers, install four condenser water pumps-each 3.75 GPM at 125 feet head, 150 HP-For new cooling tower, install one condenser water pump- 3,750 GPM at 90 feet head, 125 HP-Remove two existing water filtration systems and replace with new four water filtration systems with sweeper piping to each cooling tower cell-All new piping and piping appurtenances to the new chillers, cooling towers and pumps shall include motorized valves, strainers, check valves, isolation valves, balancing valves, gauges and accessories4. Chillers and Chilled Water Piping System-Replace existing 1100-ton chiller with new 1250-ton chiller-Provide one, new 1250-ton chiller-For two new chillers, install two, primary chilled water pumps-each 3000 GPM at 50 feet head, 50 HP, One, secondary chilled water pump-3000 GPM at 180 feet head, 200 HP. Provide primary and secondary chilled water pumps with variable frequency drive (VFD) for the two new chillers-Provide pressure differential (Delta P) valves on the chiller water mains entering each building served by the Central Plant5. Chiller Room Refrigeration Leak Detection Monitoring System-Remove existing refrigerant leak detection and monitoring system and replace with code compliant system with alarms and emergency Chiller Room Ventilation System6. Chiller Room HVAC System-Replace existing exhaust fan with new Chiller Room Ventilation Fan of 7500/11.500 cubic feet per min (CFM) with VFD to meet the air flow of normal/emergency ventilation7. Plumbing-Install cold-water isolation valve for each cooling tower supply8. Electrical and Low Voltage-Provide electrical power and low voltage system to all mechanical and plumbing equipment-New conduit and wiring shall be routed from the new cooling towers to the motor control center ?MCC? located inside the substation. The control requirements shall be powered from the existing 120/208V panel located inside the substation building9. Phasing-The project will be phased to minimize disruption to patient care.-Intent will be to work on two cells at a time to minimize downtime-Complete shut-down of the Chiller Plant shall be required to install the new 30? main condenser supply and return header10. Provide Commissioning
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$54,984
Middle of the pack for similar past awards
Most similar awards fall between $20,422 and $166,732
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1RJY GROUP LLC11 awards$7.62M
- 2VET FIRST CONSTRUCTORS, LLC1 award$7.14M
- 3JOHNSON CONTROLS INC3 awards$5.30M
- 4CHEROKEE NATION ENVIRONMENTAL SOLUTIONS, L.L.C.1 award$5.20M
- 5REON INC5 awards$4.66M
- 6J&B HARTIGAN, INC.5 awards$4.44M
- 7BROTHERS MECHANICAL SERVICES LLC4 awards$4.33M
- 8DN TANKS, LLC1 award$4.16M
Recent examples
A few of the newest similar awards in our index.
- J&B HARTIGAN, INC.Sep 30, 2025Department of Veterans Affairs$2.92MSource
- VET FIRST CONSTRUCTORS, LLCSep 30, 2025Department of Agriculture$7.14MSource
- JOHNSON CONTROLS, INCSep 30, 2025Department of Veterans Affairs$26,125Source
- SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC.Sep 30, 2025Department of Agriculture$19,716Source
- ANDERSON'S HEATING AND AIR CONDITIONING, INC.Sep 30, 2025Department of Agriculture$9,778Source
- KEMPER NORTHWEST, INC.Sep 30, 2025Department of Agriculture$131,895Source
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID f8f6cfa91acb4f47862c413b35b73fcd.