REPAIR TAXIWAY A, Phase 1 and Phase 2 (Option) both Unfunded
Dept of Defense · DEPT OF THE AIR FORCE
This notice is not accepting responses (deadline was Jun 22, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jun 22, 2026, 8:00 PM EDT
- Posted
- May 17, 2026
- Solicitation
- XTLF24-1011
- Set-aside
- No Set aside used
- Place of performance
- Enid, OK, USA
- Contracting office
- FA3029 71 FTW CVC · ENID · OK
- Source
- SAM.gov · updated May 19, 2026
Description
Amendment #2: Quote Validity: The purpose of this amendment is to revise the required period of quote validity. Vendors are hereby notified that all quotations submitted in response to this solicitatin must remain valid for a minimum of 180 calandar days following the proposal/quote due date. This requirement supersedes any previous reference to quote validity through October 31, 2026. All other requirements remain in full force and effect. Amendment #1: Site Visit Details: A site visit is scheduled for June 3, 2026 at 8:30 AM CST. You will report to the Visitor Center upon arrival to be sponsored on. All Contractors/Visitors must comply with Vance AFB access requirements, including Real ID compliant identification and adherence to installation security procedures, along with vehicle registration and current insurance. This notice is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR 12.6 and FAR 5.204, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. Solicitation number XTLF 24-1011 is issued as a Request for Quote (RFQ): XTLF 24-1011PA Phase 1 XTLF 24-1011PB Phase 2 (Option) ASRC Federal Gulf State Constructors (AFGSC), the Prime Contractor acting on behalf of the Government is requesting quotes for Repair of Taxiway A at Vance Air Force Base, Enid, Oklahoma. This requirement consists of two (2) separate phases, each solicited under its own CLIN. Both phases are currently unfunded. The Government requires pricing to support future funding actions and may award one or both phases if and when funding becomes available. Scope of Work: Work includes, but is not limited to: � Concrete pavement removal and replacement � Full-and partial-depth pavement repairs �Joint seal removal and replacement � Reconstructijon of base and subbase � Earthwork and excavation � Geotextile installation where required � Pavement markings � Turf/sod restoration � Compliance with airfield operational, safety, and access restrictions. All work shall be performed in accordance with the project specifications and drawings attached to this solicitation. CLIN Structure XTLF 24-1011PA - Phase 1 Repair Taxiway A (Unfunded) Contractor shall perform all work identified as Phase 1 in drawings and specifications. XTLF 24-1011PB - Phase 2 Repair Taxiway A (Unfunded Option) Contractor shall perform all work identified as Phase 2 in the drawings and specifications. Funding Notice (Required) Neither Phase 1 nor Phase 2 are currently funded. In accordance with FAR 52.232.18, Availability of Funds, neither AFGSC nor the Government is obligated to award any portion of this requirement or incur any liability unless and until funding is made available in a formal contract. AFGSC or the Government reserves the right to cancel this solicitation, either before or after the closing date fore receipt of proposals. In the event AFGSC or Government cancels this solicitation, AFGSC nor the Government has no obligation to reimburse any offeror for any costs, FAR 52.232-18. Period of Performance: 1. XTLF 24-1011PA Phase 1, base bid requires a 90-calendar day non-performance period and 90-calandar day performance period, for a total period of performance of 180-calendar days. 2. XTLF 24-1011PB Phase 2, bid option, requires an additional 275-calendar day performance period, for a total period of performance of 455-calendar days. Submission Instructions: � Offerors shall provide completed Firm-Fixed price quotes for Phase 1 and Phase 2 on attached Bid Forms. � Quotes shall be valid through October 31, 2026. Quotes need to be electronically sent to Betty Kliewer; betty.kliewer.ctr@us.af.mil, NLT June 23, 2026 11:00 AM CST. No late submissions will be considered or accepted. AFGSC intends to evaluate quotes using Lowest Price Technically Acceptable (LPTA). AFGSC or the Government reserves the right to: � Make no award � Make award only after funds are received � Make award to other-than-lowest if the lowest is non-responsive or non-responsible � Reject quotes that are not valid through October 31, 2026. All Offerors must be fully registerd in SAM.gov at the time of quote submission. Site Visit: A site visit will be scheduled and encouraged, Date/Time will be determined and posted as an amendment to this notice. All Contractors/Visitors must comply with Vance AFB access requirements, including Real ID compliant identification and adherence to installation security procedures, along with vehicle registration and current insurance. Questions-Answers: All questions must be submitted using only the provided Q&A Form and email to betty.kliewer.ctr@us.af.mil NLT June 15, 2026. No further questions will be excepted or answered. Responses will be issued via solicitation amendment. ATTACHMENTS: Repair Taxiway A Specifications Taxi A Plans Phase 1 Bid Sheet Phase 2 (Option) Bid Sheet Wage Determination Q&A Form Vendor Information
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$388,182
Middle of the pack for similar past awards
Most similar awards fall between $100,095 and $2.72M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1GRANITE CONSTRUCTION COMPANY2 awards$217.51M
- 2FORT MYER CONSTRUCTION CORP2 awards$217.48M
- 3H-K CONTRACTORS, INC.3 awards$196.45M
- 4WAGMAN HEAVY CIVIL INC1 award$130.12M
- 5MAYMEAD INC1 award$105.57M
- 6LPC CONTRACTORS INC1 award$80.53M
- 7KOKOSING CONSTRUCTION COMPANY, INC.1 award$70.56M
- 8CENTRAL SOUTHERN CONSTRUCTION CORP.5 awards$52.11M
Recent examples
A few of the newest similar awards in our index.
- CROWLEY HOLDINGS LLCSep 30, 2025Department of Agriculture$57,990Source
- K. W. EMERSON, INC.Sep 30, 2025Department of Agriculture$857,405Source
- RUSSELL BYRDSep 30, 2025Department of Agriculture$40,000Source
- JPI CONSTRUCTION LLCSep 30, 2025Department of Agriculture$11.93MSource
- MARCUM & SONS LLCSep 30, 2025Department of Agriculture$2.17MSource
- OMEGA BELT BUILT CONSTRUCTION SERVICES JV, LLCSep 30, 2025Department of Homeland Security$340,217Source
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 0ac06e2cc2fa491e957dd0c80a461444.