ClosedSolicitation
Transportation, Department of contract category

AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT

Transportation, Department of · FEDERAL HIGHWAY ADMINISTRATION

This notice is not accepting responses (deadline was Nov 19, 2025, 4:00 PM EST).

Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.

Response deadline
Nov 19, 2025, 4:00 PM EST
Posted
Oct 28, 2025
Solicitation
6982AF25B000019
Set-aside
No Set aside used
Place of performance
Payson, AZ, USA
Contracting office
6982AF CENTRAL FEDERAL LANDS DIVISI · LAKEWOOD · CO
Source
SAM.gov · updated Jul 5, 2026

Description

PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement � October 2025 Award � December 2025 NTP � January 2026 Contract Completion � October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.

What similar awards have paid

Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.

Typical award size

$1.85M

Middle of the pack for similar past awards

Most similar awards fall between $478,914 and $4.99M

Lower end$478,914Typical$1.85MHigher end$4.99M
Based on 500+ similar awardsSame industry code (237310)Same product/service code (Y1LB)Prime contracts (not umbrella IDVs)

Who has won work like this

Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.

Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.

Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID a5f239b9012e4a0bacc463ca6dd6f2d9.

Similar open government contracts

More in 237310 →
Federal vendorsMore from Transportation, Department ofNAICS 237310PSC Y1LBArizona contracts