Federal contractor · public award history
JB CONTRACTING, INC.
DBA JB CONTRACTING INC
Parent: JB CONTRACTING, INC. HHWNBYZHKMC5
- Awards we know about
- 40
- Typical size
- $50,000
- Middle of their public awards
- Dollars on those awards
- $16.62M
Most of their awards we can see fall roughly between $15,552 and $182,688.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$831,587
- 2025$15.79M
Awarding agencies
- Department of Energy (18)
- Department of Health and Human Services (12)
- General Services Administration (6)
- Department of Transportation (3)
- Department of Agriculture (1)
Industries & product codes
Award history
- Department of Health and Human Services$2.82M
C201302 DB SERVICE - RENOVATE THE OCCUPATIONAL MEDICAL SERVICES (OMS) CLINIC, BUILDING 10
- General Services Administration$32,500
47PM1025C0016 - USSS POST DOOR REPAIRS FOR THE REPAIR OF DOORS ON THE WHITE HOUSE COMPLEX AT 1600 PENNSYLVANIA AVE NW WASHINGTON DC 20500.
- Department of Energy$7,696
PAINT PROJECT FOR THE LOADING DOCK PARKING AREA AND THE SOUTH PARKING LOT
- Department of Energy$100,000
PROVIDE BULK FUNDING FOR SMALL PAINT JOBS NOT TO EXCEED $3,000 PER ORDER. BUILDING STANDARD FINISH SCHEDULE PRODUCTS AND MATERIALS ARE IN COMPLIANCE. COR: JERRY F. VANN MP-FOR-ALT-23-04-005
- Department of Health and Human Services$407,656
C116719 BUILDING 31B ECC REFRESH
- Department of Health and Human Services$649,546
C200927 CONSTRUCTION SERVICE - ROBOTICS SHOP & OFFICE RENOVATION/RELOCATION TO BUILDING 13
- Department of Energy$8,620
PERFORM A SINGLE PAINT PROJECT FOR THE PAINTING OF 4E-040 (HC) OFFICE SPACE. PAINTING NEW INTERIOR WALLS, DOOR FRAMES AND CORRIDOR WALLS. PATCH AND PAINT EXISTING WALLS, FRAMES, CONVECTORS, COLUMNS AND INTERIOR HALLWAYS. JB CONTRACTING, INC. 8930
- General Services Administration$87,102
USSS BLDG 411 K-9 AWNING INSTALLATION
- Department of Health and Human Services$1,060
REPLACE FLOORING AND PAINT IN BUILDING 31 SUITE B2C06 AND B2C11. THIS PROJECT WILL ALSO REQUIRE THE MOVING AND RE INSTALLING OF FURNITURE. [24-003986]
- General Services Administration$3,900
PR# EQWPM1C-25-0234- EP-47PM0525P0003 - ST E - REPAIR OF WOODEN RAMPS AND RAILINGS DHS BADGING TRAILER & GSA TRAILER 37A - DC1472SE
- General Services Administration$14,790
SOUNDSOAK
- Department of Energy$15,598
PERFORM A SINGLE PAINT PROJECT ORDER FOR THE PAINTING OF OFFICES ON A-4 WEST; FULL PAINT A475, A476, A477, A479, A480, A483, A485. WALLS, CEILING, DOOR. DIVINE WHITE. REMOVE EXISTING BASE AND PREP FOR NEW (BY OTHERS). IN SECURE AREA BEHIND GLASS DOOR
- Department of Transportation$65,337
MAINTENANCE OF ALL FAA-OWNED HVAC EQUIPMENT AT 800 & 600 INDEPENDENCE AVENUE OPTION YEAR 1
- Department of Energy$10,892
PERFORM A SINGLE PROJECT PURCHASE ORDER FOR THE PAINTING OF A-040. REMOVE COVE BASE, PAINT WALLS, DOORS, FRAMES AND BULKHEADS. REMOVE AND RE-INSTALL WHITE BOARDS. PAINT AROUND ANY EXISTING FURNISHINGS THAT CANNOT BE RELOCATED. JB CONTRACTING, INC
- Department of Energy$50,000
PROVIDE BULK FUNDING FOR SMALL ALTERATION PAINT JOBS NOT TO EXCEED $3,000 PER ORDER. BUILDING STANDARD FINISH SCHEDULE PRODUCTS AND MATERIALS ARE IN COMPLIANCE. COR: JERRY F. VANN NELSON FOR-ALT-24-06-003 BB: INDIVIDUAL PROGRAMS
- Department of Energy$50,000
PROVIDE BULK FUNDING FOR SMALL FACILITY CYCLICAL PAINT JOBS NOT TO EXCEED $3,000 PER ORDER. BUILDING STANDARD FINISH SCHEDULE PRODUCTS AND MATERIALS ARE IN COMPLIANCE. COR: JERRY F. VANN NELSON FOR-ALT-24-06-004 BB: INDIVIDUAL PROGRAMS
- Department of Energy—
REQUISITION 25MA000030 WAS ISSUED TO PROVIDE PAINTING SERVICES FOR THE FORRESTAL AND GERMANTOWN LOCATIONS. ALL WORK WILL BE IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK, AND TERMS AND CONDITIONS. THE PERIOD OF PERFORMANCE IS BASE YEAR
- Department of Energy$15,552
PERFORM A SINGLE PAINT PROJECT IN SUPPORT OF THE NEW ADMINISTRATION TRANSITION S LOCATIONS PATCHING AND PAINTING TO INCLUDE: S1 7B & 7D CORRIDOR, S1-7A CORRIDOR, S3-7A CORRIDOR, S4-7A-075, SCHEDULING & ADVANCE 7B-192. **PLEASE ASSIGN TO MO
- Department of Energy$25,000
REQUEST GTN BULK PAINT BLANKET FUNDING IN THE AMOUNT OF $25,000 FOR SUPPORTING GTN ALTERATION PAINT JOBS NOT TO EXCEED $3,000 PER ORDER.
- Department of Energy$50,000
PROVIDE BULK FUNDING FOR SMALL PAINT JOBS NOT TO EXCEED $3,000 PER ORDER. BUILDING STANDARD FINISH SCHEDULE PRODUCTS AND MATERIALS ARE IN COMPLIANCE.
- Department of Energy$10,540
PERFORM A SINGLE PAINT PROJECT ORDER FOR THE PAINTING OF GM-097 DUE TO WATER REMEDIATION. PAINTING TO INCLUDE OFFICES, INTERIOR HALLWAY, COLUMNS AND FRAMES. BB: MA FOR-ALT-24-07-008 NELSON/BAXTER
- Department of Energy$10,001
THE PURPOSE OF THIS TASK ORDER IS TO PERFORM A SINGLE PAINT PROJECT FOR GC-6B-222; PATCH & PAINT ENTIRE SUITE TO INCLUDE EXISTING AND NEW HALLWAY WALLS, NEW AND EXISTING FRAMES. DONN WALLS IN SOUND SOAK SPACES, OFFICES, CONVECTORS AND COLUMNS.
- Department of Energy$52,428
PERFORM A SINGLE PAINT PROJECT ORDER FOR THE PAINTING OF EERE 5TH FLOOR TO INCLUDE 90 OFFICES, 45 CONVECTORS, 43 COLUMNS, 180 FRAMES, HALLWAYS AND COMMON AREAS. PLEASE ASSIGN TO MONICA SERRANO JB CONTRACTING, INC. 89303022DMA000024 COR: JERRY
- Department of Health and Human Services$182,688
C116624-PROVIDE DESIGN AND CONSTRUCTION FOR ACCESS TO ROOF HATCH FROM THE FLOOR THROUGH INTERSTITIAL SPACE AND PROVIDE FALL PROTECTION AT THE ROOF EDGE AND AROUND ROOF HATCH OPENING
- Department of Energy$10,680
PERFORM A SINGLE PAINT PROJECT FOR THE PAINTING OF TWO TRANSITION SUITES (1E-226 & 2E-052 TO INCLUDE: FOUR (4) OFFICES IN 1E-226, SOUND SOAK REMOVED REQUIRING EXCESSIVE PATCHING AND TO INCLUDE WALLS, DOOR FRAMES, COLUMNS AND INSTALLATION OF COVE
- Department of Energy$25,000
REQUEST GTN BULK PAINT BLANKET FUNDING INT HE AMOUNT OF $25,000 FOR SUPPORTING GTN ALTERATION PAINT JOBS NOT TO EXCEED $3,000 PER ORDER. REFER TO JB CONTRACTING, INC. CONTRACT NUMBER 89303022DMA000024. BUILDING STANDARD FINISH SCHEDULE PRODUCTS AND M
- Department of Health and Human Services—
PARKING GARAGE PRESSURE WASH AND OTHER CLEANING SERVICES
- Department of Transportation$108,818
MAINTENANCE CONTRACT FOR PA SYSTEM
- Department of Health and Human Services$2.14M
C109866 DESCRIPTION - OUTPATIENT EXAM ROOM REFRESH 3 & 8 - NEW AWARD FOR OUTPATIENT EXAM ROOM RENOVATIONS CO - DAN BURK CS - DAVE SEID COR - MITCHELL TARAGIN VENDOR POC - ERIC BONILLA
- Department of Transportation$62,800
MAINTENANCE OF ALL FAA-OWNED HVAC EQUIPMENT AT 800 & 600 INDEPENDENCE AVENUE
- Department of Health and Human Services$124,846
C200173 - BLDG 10 INTERSTITIAL SPACE INCREASE ACCESS PANEL SIZE AND INSTALL MOUNTED LADDER - MARK CALBECK
- Department of Health and Human Services$398,560
C116569 - B10B CC OP 10 AND OP 05 NEW CLEAN & DIRTY UTILITY RMS AND ENT PROCEDURE RM
- Department of Energy—
PROVIDE BULK FUNDING FOR SMALL ALTERATION PAINT JOBS NOT TO EXCEED 3,000 PER ORDER. BUILDING STANDARD FINISH SCHEDULE PRODUCTS AND MATERIALS ARE IN COMPLIANCE. PLEASE ASSIGN TO CONTRACT SPECIALIST MONICA SERRANO. COR: JERRY F. VANN NELSON FOR
- Department of Health and Human Services$420,170
GARAGE PRESSURE WASHING AND OTHER CLEANING SERVICES
- General Services Administration$42,054
THE PURPOSE OF THIS PROCUREMENT IS FOR VMF OFFICE 17 & 25 RECONFIGURATION
- General Services Administration$2.87M
WINDOW CLEANING SERVICES, ST. ELIZABETH'S CENTER BUILDING
- Department of Health and Human Services$4.78M
CRC ROOM/RESTROOM RENOVATION
- Department of Health and Human Services$140,016
C200092 - FURNISH LABOR AND MATERIALS ASSOCIATED WITH THE FOLLOWING
- Department of Agriculture$806,587
BUILDING 229 ROOFING SYSTEM REPLACEMENT
- Department of Energy$25,000
PR FOR BULK FUNDING OF $25,000.00 FOR SMALL PAINT JOBS (NOT TO EXCEED $3,000) AT GERMANTOWN THAT REQUIRE A QUICK TURNAROUND FOR FACILITIES PROJECTS THAT DO NOT GET BILLED BACK TO CUSTOMER.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.