Federal contractor · public award history
DJ&A, P.C.
DBA DJ&A, P.C
Parent: DJ&A, P.C. ET9MWK3PM4U6
- Awards we know about
- 40
- Typical size
- $212,381
- Middle of their public awards
- Dollars on those awards
- $10.53M
Most of their awards we can see fall roughly between $81,698 and $440,955.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- Department of Transportation (15)
- Department of Agriculture (13)
- Department of the Interior (11)
- General Services Administration (1)
Industries & product codes
Award history
- Department of Agriculture$97,842
THE INTENT OF THIS TASK ORDER IS TO OBTAIN DESIGN SERVICES FOR BRIDGE REPLACEMENT OF TWO UNITED STATE FOREST SERVICE (USFS) TRANSPORTATION SYSTEM STRUCTURES. WORK INCLUDES A SITE VISIT, TOPOGRAPHIC SITE SURVEY, HYDRAULIC ANALYSIS, GEOTECHNICAL INVEST
- Department of Agriculture$303,949
R5 GEOGRAPHIC INFORMATION SYSTEMS AND REMOTE SENSING SERVICES
- Department of Transportation$237,629
A/E GEOTECHNICAL INVESTIGATION FOR WY NP GRTE 10(1) BUFFALO FORK CAUSEWAY, GRAND TETON NATIONAL PARK, WYOMING
- Department of Transportation$605,642
NM BR AAO EL VADO HERON & EL VADO ROAD REHABILITATION - PRELIMINARY AND FINAL DESIGN
- Department of Transportation$67,101
NM BR AAO EL VADO HERON & EL VADO ROAD REHABILITATION
- Department of the Interior$293,862
WASO 349254 - LICENSE PLATE READER (LPR)
- Department of the Interior$745,405
YELL_312116_N040 TITLE LLL SERVICES
- Department of the Interior$240,321
RANGELAND MONITORING FOR IDIQ TO12
- Department of Agriculture$548,073
ERFO-DR CUSTER GALLATIN NF BRIDGE REPLACEMENT & REPAIR DESIGN
- Department of Transportation$136,798
A/E GEOTECHNICAL INVESTIGATION FOR MT BLM WMDD 8804(2); GARNET GHOST TOWN ROADS REHABILITATION
- Department of the Interior$49,629
ARCHITECTURAL & ENGINEERING TITLE III SERVICES, FLAGG RANCH CAMPGROUND WATER / WASTEWATER REPLACEMENT, GRAND TETON NATIONAL PARK
- Department of Agriculture$665,868
A&E SPILLWAY SIZING AND RISK REDUCTION STUDY
- Department of Agriculture$233,840
GAOA REPLACEMENT OF RRS SERVING REC VISITORS ACROSS MULT NFS--FREWIN
- Department of the Interior$229,658
MEVE NAVAJO WATER TANK A&E
- Department of the Interior$75,204
MEVE NAVAJO HILL WATER TANK EA
- Department of the Interior$478,046
GAOA - PUMPHOUSE REHAB DESIGN AT BENTON LAKE NWR
- Department of Agriculture$428,591
GROUSE AND DRY CREEK TREE IMPROVEMENT AREA IMPROVEMENTS IRRIGATION DESIGN
- Department of Transportation$93,339
A/E GEOTECHNICAL INVESTIGATION FOR WA NP OLYM 104(2), FINLEY CREEK BRIDGE REHABILITATION
- Department of Transportation$20,000
NM BR AAO EL VADO HERON & EL VADO ROAD REHABILITATION - POST DESIGN TASK ORDER
- Department of Transportation$722,970
NV BL SONV 500(3) RED ROCK TRAIL THE PURPOSE OF THIS TASK ORDER IS TO AWARD FINAL DESIGN AND ENVIRONMENTAL EA SERVICES FOR THE SUBJECT PROJECT.
- Department of Agriculture$104,766
TWO SWIFT CREEK AOPS AND ONE AOP AT OLD MAN PASS
- Department of Agriculture$156,919
R1 DAMS HYDROLOGIC MODELING AND EARLY WARNING SYSTEMS
- Department of Agriculture$63,629
PLANT CREEK AOP'S SURVEY AND DESIGN
- Department of Agriculture$48,841
PRIEST LAKE RD NEEDS TO UPDATE THE EXISTING WATER SYSTEM WITH A MORE RELIABLE AND MODERNIZED SYSTEM THAT CAN WITHSTAND A VARIABLE NUMBER OF USERS AS WELL AS ENVIRONMENTAL/WEATHER CHALLENGES RESULTING IN LOST POWER FOR THE PUMP SYSTEMS.
- Department of Transportation$175,417
CA ERFO FS SNBER 2023-3(1) SANTA ANA ROAD: ENVIRONMENTAL SERVICES CULTURAL RESOURCE INVESTIGATION UNDER NHPA TO SUPPORT USFS AND ENDANGERED SPECIES ACT AND DELINEATION OF AQUATIC RESOURCES UNDER THE CLEAN WATER ACT.
- Department of Transportation$130,000
WY NPS GRTE 2020(1), MOOSE WILSON ROAD PHASE 2 ENGINEERING SUPPORT DURING ADVERTISEMENT AND CONSTRUCTION
- Department of Transportation$519,936
MIDSLOPE ATTENUATORS STUDY PHASE 2
- Department of Transportation—
2021 A/E MULTI-DISCIPLINE IDIQ
- Department of Transportation—
ARCHITECT & ENGINEER (BROOKS ACT) FULL SERVICE DESIGN INDEFINITE DELIVERY-INDEFINITE QUANTITY CONTRACT
- Department of the Interior$248,907
TITLE II SCHEMATIC DESIGN & DESIGN DEVELOPMENT & FINAL CONSTRUCTION DOCUMENTS SERVICES, POST KNP FIRE REHABILITATION OF CLOVER CREEK WASTEWATER DISPOSAL
- Department of Agriculture—
REGION 1 STRUCTURAL, CIVIL, WATER&WASTEWATER INSPECTION AND DESIGN (SCWWID) IDIQ
- Department of the Interior$809,669
YOSE 196416 DD/CD/SS EL PORTAL ADMIN CAM
- Department of Transportation$195,105
OR FLAP HARNEY 201(1); OR FLAP JEFFER 739(1); OR FLAP WHEELER BCR(1) THE PURPOSE FOR THIS TASK ORDER IS FOR THE A&E TO PROVIDE SCOPING SERVICES FOR 3 OREGON PROJECTS.
- Department of Agriculture$81,524
HAT POINT LOOKOUT TOWER STRUCTURAL INSPECTION AND EVALUATION
- Department of Transportation$1.20M
6982AF19D000006/6982AF22F000067 CA FLAP MON T10(1) FORT ORD NM TRAIL SCOPING SERVICES
- Department of the Interior$81,756
MT BENTON LAKE WMD REHAB ENTR RD
- Department of the Interior$364,480
RANGELAND MONITORING FOR IDIQ TO11
- Department of Transportation$12,988
MASTERWORKS/EEBACS CONVERSION, DESIGN SUPPORT
- General Services Administration—
FEDERAL SUPPLY SCHEDULE CONTRACT
- Department of Agriculture$57,726
PERFORM LOAD RATINGS ON CAST-IN-PLACE CONCRETE CULVERTS REPORTED AS BRIDGES (CRABS). WPAP#708788
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.